Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 22, 2025 at 8:00 PM
Updated October 23, 2025
This is a service / maintenance or supply contract in Ventura, California. Contact the soliciting agency for additional information.
Ventura Pier Donor Bench Assembly Questions to be submitted via Email September 17, 2025 2PM All questions regarding this Invitation to Bid (ITB) shall be submitted via email to Patricia Zavala, Senior Buyer, in the Purchasing and Contracts Division at pzavala@cityofventura.ca.gov PRIOR to September 17, 2025, at 2:00 PM. Any questions submitted after the deadline shall be rejected. Any response will be in the form of an addendum. The City reserves the right to reject any or all bids. The City is seeking Bids for a contractor to provide all labor, materials and equipment to refurbish or assemble, install brass plaques and pier donor benches on the Ventura Pier, as requested. Currently, there are 48 pier donor benches on the Ventura Pier. The scope of work includes: Specifications: 8' Cast Bench, 3 arm, IPE Wood slats treated with coat of tongue oil, Frame Double powder coated and coated with two coats of MinWax Quick-Drying Polyurethane, color black, model DuMor #Z98-82IPE A. Pickup bench at City Facilities shop at 336 Sanjon Road, Ventura. Apply two coats of MinWax Quick-Drying Polyurethane to (3) metal supports prior to assembly. Coat the IPE wood slats with tongue oil prior to installation. B. Route and install 2" x 10" Donor Brass Plaque provided by the Pier Into the Future Director through City Facilities. Plaques shall be installed with two-part epoxy. Each bench has two plaques centered on the top slat. Plaque(s) shall be installed within 15 calendar days of receiving the plaque(s) and work order. C. Assemble City-provided Pier Bench per manufacturer's instructions. D. Transport pier donor bench to Ventura Pier and install in the designated location per instructions from Pier Into the Future Director and Facilities department. Bench shall be bolted to the pier deck boards with 3/8" X 3" length, stainless steel lag bolts and flat washers. Bench shall be installed within 21 calendar days after receiving the work order. E. Occasionally, a plaque may need to be installed or replaced on the bench that is installed on the pier. Plaque(s) shall be installed within 15 calendar days of receiving the plaque and work order. F. Removal of a pier donor bench from the Ventura Pier and deliver to City Facilities shop at 336 Sanjon Road, Ventura within 15 calendar days of the work order. G. Bench refurbishment - Remove pier donor bench from the Ventura Pier, disassemble, sandblast, repaint with primer and marine grade paint, reassemble and reinstall pier bench on the Ventura pier. Contractor shall provide estimated timeframe per request and approved by the Pier Into the Future Director and City Facilities.
Post-Bid
Municipal
Public - City
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 1, 2025
October 31, 2025
Multiple Locations, Ventura, CA
Related To This Project
Ventura, CA
Bid Date: Oct 28 2025
Ventura, CA
Bid Date: Oct 15 2025
Ventura, CA
Bid Date: Oct 30 2025
Ventura, CA
Bid Date: Oct 07 2025
Ventura, CA
Bid Date: Nov 11 2025
Ventura, CA
Bid Date: Oct 14 2025
Ventura, CA
Bid Date: Oct 16 2025
Ventura, CA
Bid Date: Oct 21 2025
Ventura, CA
Bid Date: Oct 28 2025
Ventura, CA
Bid Date: Oct 30 2025
Ventura, CA
Bid Date: Oct 14 2025
Ventura, CA
Bid Date: Oct 14 2025
Ventura, CA
--
Ventura, CA
Bid Date: Sep 22 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
