BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2025 at 7:00 PM

Updated November 27, 2025

Demolition, site work and new construction of a military facility in Boston, Massachusetts. Completed plans call for the demolition of a military facility; for the construction of a military facility; and for site work for a military facility.

Notice ID- 22493805, LCJV-USCG-11 Demolish and remove three Aids to Navigation (ATON) structures--Sabin Point Daybeacon SP (LLNR 18455), Lobster Rocks Daybeacon 13A (LLNR 10265), and Abbot Rock Daybeacon 13A (LLNR 10265)--in their entirety. Demolish and remove the existing Bowditch Ledge Daybeacon (LLNR 10025), and furnish and install a replacement aid. All work shall be performed in accordance with project specifications, drawings, applicable local, State, and Federal codes, and all required permitting. Location: Sabin Point Daybeacon SP - Sabin Point, Riverside, RI 02915 Lobster Rocks Daybeacon 13A - Lobster Rocks, off Cohasset, MA 02025 Abbot Rock Daybeacon 13A - Abbot Rock, off Cohasset, MA 02025 Bowditch Ledge Daybeacon - Bowditch Ledge, off Salem, MA 01970 Construction Magnitude: The magnitude of this construction project is between $500,000 and $1,000,000.IAW FAR 36.204 The project is defined by the Contract Documents and consists of all work including equipment, materials, labor and supervision necessary for removal, repairs and/or replacement of aids to navigation light structures and incidental related work. Request for Information (RFI) Due Date: 16 October 2025 at 2:00PM EST *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PSN: 22493805 BBI #1 LLNR 10265, Lobster Rocks Daybeacon 13A: Demolish and remove aid in its entirety. Remove granite block substructure, concrete rubble and stone fill ballast. Estimated total removal quantity of 65-cy. BBI #2 LLNR 10065, Abbott Rock Daybeacon: Demolish and remove aid in its entirety. Remove granite block substructure and stone rubble. Estimated total removal quantity of 150-cy. BBI #3 LLNR 10025, Bowditch Ledge Daybeacon: Demolish and remove existing aid in its entirety, and furnish and install replacement aid. Remove granite rubble and riprap mound. Estimated total removal quantity of 500-cy. BBI #4 LLNR 18455, Sabin Point Daybeacon SP: Demolish and remove aid in its entirety. The work is located at various locations under the USCG First District Area of Operation (AOR), approximately as indicated below. The exact location will be shown by the COR. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started. In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements: a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain. b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the KO. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

Award

Military

$1,171,000.00

Public - Federal

Demolition, New Construction, Site Work

16

19

5

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
7
Bidding Soon
2,274
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2025

December 15, 2025

Project location map

Multiple Locations, Boston, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.