BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 24, 2025 at 7:00 PM

Updated November 25, 2025

Site work and new construction of a water / sewer project in Cape Coral, Florida. Working plans call civil work for a water / sewer project.

The City of Cape Coral, Florida, is seeking proposals for design-build services for Judd Creek water and sewer main extensions from experienced and qualified design-build firms. Detailed specifications and instructions for submittal can be obtained online at the provided city website. Contact information is provided for assistance. Question Deadline 10/16/2025 at 2:00 PM ET online submission. Scope of Work The City is seeking to engage qualified firms to submit proposals (RFQs) for Design-Build services - the design, permitting, construction and place into operation potable water transmission mains and sanitary sewer transmission force mains connecting the Judd Creek area to the Citys potable water and wastewater treatment systems. Hydraulic modeling of the potable water and sewer force main transmission and distribution piping systems, and condition evaluation of the wastewater collection and transmission system, will be components of the engineering design portion of the project. Installation of potable water mains and wastewater force mains utilizing conventional open cut construction methods as well as trenchless construction methods and potential rehabilitation and retrofit of duplex lift stations will be a component of the building construction services portion of the project. The successful proposer will assist the City with engineering consulting services and infrastructure construction services. Services will be provided under a contract with negotiated fixed fees for assessment of utility extension needs, selection and evaluation of design alternatives, final design, permitting, project management, overhead, profit, and a guaranteed maximum price with appropriate surety bonds. Services will also include, but not limited to, engineering investigations, utility route planning, cost estimating, advertising and administration of subcontracts, start-up, O&M manuals, training, and all related work required for a complete project.

Final Planning

Water / Sewer

$15,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2025

January 2, 2026

Project location map

To be determined, Cape Coral, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.