BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 1, 2025 at 8:00 PM

Updated October 2, 2025

Site work for a transportation facility in Central Park, Washington. Working plans call for site work for a transportation facility.

The project includes the rail portion of a larger terminal expansion project for a proposed bulk soy meal transload facility. The existing rail infrastructure will be rebuilt in several locations in the marine terminal area and the construction of new ladder tracks for train storage, along with the construction of a new double loop rail line between the eastern rail loops and western connection to the main line for access to a proposed rail unloading facility. Improvements include additional switches and improvements to curves and connections to existing rail lines. Construction includes the repair of existing sub grade and bedding and the installation of new sub grade and bedding materials along with new rail, ties and switches. Asphalt and concrete aprons will be replaced or added as needed at rail crossings. County: Grays Harbor Agency: Port of Grays Harbor Length : 7.580 Begin Termini : Port of Grays Harbor End Termini : Port of Grays Harbor As of October 1 , 2025, the project is in Final Planning status. Anticipated letting Year is 2025. WADOT - Terminal 4 Expansion Project Rail Upgrades *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Transportation Terminals

$29,520,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
91
Bidding Soon
1,425
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2025

Project location map

To Be Determined, Central Park, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.