Published December 5, 2025 at 7:00 PM
Updated December 6, 2025
Site work, renovation and addition to a mixed-use development in Grand Marais, Minnesota. Completed plans call for the addition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.
As of December 5, 2025, final bid review is going to the school district on December 11, 2025. Bid results and more information should be available after that date. Cook County Schools - New Additions and Renovations This project will consist of Multiple Work Scopes for all the work necessary for the construction of new additions and renovations. Work Scopes consist of the following: Earthwork, Precast, General Construction, Fire Suppression, Mechanical and Electrical. Schedule: Onsite work will begin on the premises no later than May 18th, 2026. Substantial completion is November 29th, 2027. Prevailing Wage: No The project consists of multiple work scopes for all of the work necessary for the construction of new additions and renovations. This consists of upgrading spaces at the district's PreK-12 school building. Work includes improvements to accessibility and building security, construction of additional common and flexible spaces, construction of a new gymnasium, construction of new student services addition, interior renovations, and deferred maintenance improvements. Work scopes consist of the following: Earthwork, Precast, General Construction, Fire Suppression, Mechanical, and Electrical. This Work Scope consists of the Work directly and indirectly required by the specification sections listed below, plus project drawings, addenda, and other documents identified as part of the Agreement, regardless of design discipline, drawing sheet identification, or jurisdictional requirements This Work Scope consists of the Work directly and indirectly required by the specification sections listed below, plus project drawings, addenda, and other documents identified as part of the Agreement, regardless of design discipline, drawing sheet identification, or jurisdictional requirements. 1. Specific Specifications Sections that are the responsibility of the Work Scope: Division 00 - Bid and Contract Requirements Complete Division 01 - General Requirements Complete Division 03 - Concrete 03 41 13 - Precast Hollow Core Planks Complete 03 45 00 - Precast Architectural Concrete. Complete Division 07 - Thermal and Moisture Protection 07 92 00 - Joint Sealants As it Applies This Work Scope consists of the Work directly and indirectly required by the specification sections listed below, plus project drawings, addenda, and other documents identified as part of the Agreement, regardless of design discipline, drawing sheet identification, or jurisdictional requirements. 1. Specific Specifications Sections that are the responsibility of the Work Scope: Division 00 - Bid and Contract Requirements Complete Division 01 - General Requirements Complete Division 02 - Existing Conditions 02 41 00 - Demolition Complete Division 03 - Concrete 03 10 00 - Concrete Forming and Accessories Complete 03 20 00 - Concrete Reinforcement Complete 03 30 00 - Cast-In-Place Concrete Complete Division 04 - Masonry Complete Division 05 - Metals Complete Division 06 - Wood, Plastics & Composites Complete Division 07 - Thermal & Moisture Protection 07 11 13 - Bituminous Damp Proofing Complete 07 13 00 - Sheet Waterproofing Complete 07 21 00 - Thermal Insulation Complete 07 25 00 - Weather Barriers Complete 07 42 13 - Metal Wall Panels Complete 07 46 46 - Fiber Cement Siding Complete 07 53 00 - Elastomeric Membrane Roofing Complete 07 62 00 - Sheet Metal Flashing and Trim Complete 07 81 00 - Applied Fireproofing Complete 07 84 00 - Firestopping As It Applies 07 90 05 - Joint Sealers As It Applies Division 08 - Doors & Windows Complete Division 09 - Finishes Complete Division 10 - Specialties 10 11 01 - Visual Display Boards Complete 10 14 00 - Interior Signage Complete 10 14 19 - Cast Letters Complete 10 21 13.19 - Solid Plastic Toilet Compartments Complete 10 21 23 - Cubicles Complete 10 26 01 - Wall and Corner Guards Complete 10 28 00- Toilet, Bath and Laundry Specialties Complete 10 44 00 - Fire Protection Specialties Complete 10 51 00 - Lockers Complete 10 51 29 - Phenolic Lockers Complete 10 81 13 - Architectural Bird Control Complete Division 11 - Equipment 11 66 23 - Gymnasium Equipment Complete Division 12 - Furnishings Complete This Work Scope consists of the Work directly and indirectly required by the specification sections listed below, plus all project drawings, addenda, and other documents identified as part of the Agreement, regardless of design discipline, drawing sheet identification, or jurisdictional requirements. 1. Specific Specifications Sections that are the responsibility of the Work Scope: Division 00 - Procurement Requirements/Conditions of the Contract Complete Division 01 - General Requirements Complete Division 07 - Thermal and Moisture Protection 07 84 00 - Firestopping & Smoke Seals As it Applies 07 90 05 - Joint Sealers As it Applies Division 08 - Openings 08 31 00 - Access Doors As it Applies Division 22 - Plumbing Systems [all sections within Division 22] Complete Division 23 - HVAC Systems [all sections in Division 23] Complete This Work Scope consists of the Work directly and indirectly required by the specification sections listed below, plus all project drawings, addenda, and other documents identified as part of the Agreement, regardless of design discipline, drawing sheet identification, or jurisdictional requirements. 1. Specific Specifications Sections that are the responsibility of the Work Scope: Division 00 - Bid and Contract Requirements Complete Division 01 - General Requirements Complete Division 07 - Thermal and Moisture Protection 07 84 00 - Firestopping & Smoke Seals As it Applies 07 90 05 - Joint Sealers As it Applies Division 08 - Openings 08 3100 - Access Doors As it Applies Division 26 - Electrical [all sections within Division 26] Complete Division 27 - Communications [all sections within Division 27] Complete Division 28 - Fire Detection & Alarm [all sections within Division 28] Complete A. All Specifications, corresponding Drawings and all Addenda form a complete set of documents for electrical work for this project, and no part shall be considered complete without the other. B. The Specifications, Drawings, and all Addenda describe both the design characteristics and functional performance criteria that the completed electrical and telecommunications and electronic safety and security systems shall include. C. Contractor shall obtain all required licenses, permits, plan reviews, inspections and pay all fees, costs and all other charges for this project. All sales, use and any other taxes shall be paid by Contractor. D. Electrical Work shall comply with all ordinances, laws, regulations and codes applicable to the work involved. If, in any instance, the plans and specifications conflict with such laws, the stricter requirement shall take preference. 1. If Contractor is aware of conflicts between drawings or specifications and such codes or regulations, they shall be brought to the Engineer's attention prior to commencing work. If Contractor performs work in violation of such codes or regulations, Contractor shall correct the violation at his expense. E. Work under Division 26 includes providing all labor and materials necessary for satisfactory completion of all electrical work shown on all drawings and in all specification divisions. A. All Specifications, corresponding Drawings and all Addenda form a complete set of documents for electrical work for this project, and no part shall be considered complete without the other. B. The Specifications, Drawings, and all Addenda describe both the design characteristics and functional performance criteria that the completed telecommunications systems shall include. C. Contractor shall obtain all required licenses, permits, plan reviews, inspections and pay all fees, costs and all other charges for this project. All sales, use and any other taxes shall be paid by Contractor. D. Electrical Work shall comply with all ordinances, laws, regulations and codes applicable to the work involved. If, in any instance, the plans and specifications conflict with such laws, the stricter requirement shall take preference. E. If Contractor is aware of conflicts between drawings or specifications and such codes or regulations, they shall be brought to the Engineer's attention prior to commencing work. If Contractor performs work in violation of such codes or regulations, Contractor shall correct the violation at his expense. F. Work under Division 27, includes providing all labor and materials necessary for satisfactory completion of all electrical work shown on all drawings and in all specification divisions. In general, this consists of the following: 1. Telecommunications Systems. 2. Intercom Systems. 3. A/V Systems. 4. Digital Signage Systems. G. Site Investigation 1. Prior to submitting bids, visit the work site to become familiar with existing conditions which may affect the cost of the project. This includes measurements for lengths, quantities, clearances and all other field verifiable conditions. 2. No extra charges will be allowed because of failure of Contractor to become familiar with all existing conditions. 3. Where work under this project requires extension, relocation, or modifications to existing equipment, systems or installations the existing equipment, system or installations shall be restored to their original condition, with exception to the work under this project, before completion. 4. Existing equipment, systems and installations which are not detailed on the drawings must still be restored to their original condition. A. All Specifications, corresponding Drawings and all Addenda form a complete set of documents for electrical work for this project, and no part shall be considered complete without the other. 1. SPEC WRITER'S NOTE: A performance spec is written requirement that describes the functional performance criteria required for a particular equipment, material, or product. A design specification describes design characteristics and manufacturing methodology. Our specifications include aspects of both. B. The Specifications, Drawings, and all Addenda describe both the design characteristics and functional performance criteria that the completed electronic safety and security systems shall include. C. Contractor shall obtain all required licenses, permits, plan reviews, inspections and pay all fees, costs and all other charges for this project. All sales, use and any other taxes shall be paid by Contractor. D. Electrical Work shall comply with all ordinances, laws, regulations and codes applicable to the work involved. If, in any instance, the plans and specifications conflict with such laws, the stricter requirement shall take preference. E. If Contractor is aware of conflicts between drawings or specifications and such codes or regulations, they shall be brought to the Engineer's attention prior to commencing work. If Contractor performs work in violation of such codes or regulations, Contractor shall correct the violation at his expense. F. Work under Division 28 includes providing all labor and materials necessary for satisfactory completion of all electrical work shown on all drawings and in all specification divisions. In general, this consists of the following: 1. Supervisory control and telemetry. 2. Electronic Safety and Security Systems. 3. Other systems specified, indicated, or shown. G. Site Investigation 1. Prior to submitting bids, visit the work site to become familiar with existing conditions which may affect the cost of the project. This includes measurements for lengths, quantities, clearances and all other field verifiable conditions. 2. No extra charges will be allowed because of failure of Contractor to become familiar with all existing conditions. 3. Where work under this project requires extension, relocation, or modifications to existing equipment, systems or installations the existing equipment, system or installations shall be restored to their original condition, with exception to the work under this project, before completion. 4. Existing equipment, systems and installations which are not detailed on the drawings must still be restored to their original condition. Bid-Results:- 1. Earthwork- Northland-$2,786,400 2. Precast-Moline-$1,111,337 3. General Construction-BCI-$10,700,069 4. Fire Suppression-Escape-$219,000 5. Mechanical-A G Obrein-$3,736,910 6. Electrical-Hunt-$2,489,327
Bid Results
Educational
$21,043,043.00
Public - County
Addition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 5, 2025
May 18, 2026
101 W 5th St, Grand Marais, MN
Related To This Project
Grand Marais, MN
Bid Date: Nov 30 2025
Grand Marais, MN
Bid Date: Oct 10 2025
Grand Marais, MN
Bid Date: Oct 07 2025
Grand Marais, MN
Bid Date: Sep 16 2025
Grand Marais, MN
Bid Date: Aug 19 2025
Grand Marais, MN
Bid Date: Aug 28 2025
Grand Marais, MN
Bid Date: Jul 22 2025
Grand Marais, MN
--
Grand Marais, MN
Bid Date: Jun 05 2025
Grand Marais, MN
Bid Date: May 26 2025
Grand Marais, MN
Bid Date: May 13 2025
Grand Marais, MN
Bid Date: May 06 2025
Grand Marais, MN
Bid Date: Apr 10 2025
Grand Marais, MN
Bid Date: Apr 08 2025
Grand Marais, MN
Bid Date: Apr 08 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.