BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 17, 2025 at 8:00 PM

Updated October 18, 2025

Site work and paving for a road / highway in Glenwood, Minnesota. Completed plans call for site work for a one-story above grade road / highway; and for paving for a road / highway.

Minn. Proj. No: CRP 6125(260) The work consists of full depth reclamation, bituminous surfacing, and aggregate shoulder construction on Pope County CSAH 3 and CSAH 26 for a total length of 8.078 miles. Major items of work include: Aggregate Surfacing, Class 1 (5,870 Tons), Stabilized Full Depth Reclamation (81,820 SY), Type SP 9.5 Wearing Course Mix (2,C) (18,905 Tons), Traffic Control (2 LS), and Paint Striping (52,820 LF), along with other items. Bidders must adhere to minimum wage rates predetermined by law. Compliance with the Work Hours Act of 1962 and affirmative action requirements under the Minnesota Human Rights Act and relevant federal regulations is required. Bids must include a Bidder's Bond for at least five percent of the proposal amount. Bidders must obtain a full plan and proposal packet from the County Highway Engineer's Office for a non-refundable fee. The County Board of Commissioners reserves the right to reject any or all bids and to waive any defects. October 13, 2025 Deadline for questions and substitution requests at 5:00 PM CT

Bid Results

Roads / Highways

$1,671,492.00

Public - County

Paving, Site Work

8

16

5

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
20
Bidding Soon
340
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2025

December 1, 2025

Project location map

To be determined, Glenwood, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.