BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 13, 2025 at 7:00 PM

Updated November 14, 2025

Site work, outdoor lighting and renovation of a mixed-use development in Pompano Beach, Florida. Completed plans call for the renovation of a playground / park / athletic field; for site work for a playground / park / athletic field; water / sewer project; and for outdoor lighting for a playground / park / athletic field.

This project entails providing all labor, equipment, tools, and materials necessary to construct a new multipurpose natural grass sports field, synthetic track surface, and othertrack and field amenities, a concession building with bathrooms, storage, bleachers, and a second-floor press box. The scope of work includes, but is not limited to, sitework, drainage, foundation, block walls, mechanical, plumbing, electrical, shade structure, landscape, irrigation, fencing, parking, and site lighting. For additional information, call the Purchasing Division at (954) 786-4098.9/26/2025 7875707 Question Deadline 10/17/2025 at 12:00 PM ET The Work generally includes Construction of the following items, as defined in the Construction documents: 1. New multipurpose natural turf grass sports field with electronic digital LED scoreboard. 2. New running track around sports field with synthetic rubberized surfacing and chain-link fence surrounding the track. 3. New Field events - high jump, long jump, pole vault, discus throw, shot put. 4. New Concession-Restroom-Storage building with integrated Press Box on 2nd level. 5. New bleachers with shade structure at building, west of sports field and new bleachers without shade, east of the sports field. 6. New sports lighting to illuminate field and track. 7. New parking lot with access from NW 16th Street, north of the park. 8. New park access from NW 15th Place, south of the park. 9. New perimeter metal picket & chain-link fence around the park & parking lot. 10. New site furniture. 11. New landscape, irrigation, and drainage system. 12. New site lighting including parking lot, pedestrian and site feature illumination. 13. New site and building signage Parking Lot & Entry Plaza section covers the area between NW 16th & the perimeter fence north of the track.

Bid Results

Playgrounds / Parks / Athletic Fields

$6,696,378.00

Public - City

Outdoor Lighting, Renovation, Site Work

98

26

31

4

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
263
Active Projects
123
Bidding Soon
1,776
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2025

December 12, 2025

Project location map

212 NW 16th St, Pompano Beach, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.