BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 18, 2025 at 7:00 PM

Updated November 19, 2025

Remodeling of a municipal facility in Waukesha, Wisconsin. Completed plans call for the remodel of a one-story above grade municipal facility.

Waukesha County Highway Locker Room Counters and Toilet Partitions Project #0025-2025. No additional scope of work or instructions to bidders are provided. Scope of Work: Replacement of the countertops and toilet partitions in the Men's and Women's Locker Rooms at the Waukesha County Main Highway Building. Countertops o Demolish and dispose of existing plastic laminate countertops and sink bowls in the Men's and Women's Main Highway Locker Rooms (Refer to "Exhibit B - Drawing HY-G"). o Disconnect and salvage existing faucets. o Reinstall salvaged faucets in new countertops. o Furnish and install new replacement countertops and splashes. o New tops to be Corian Solid Surface, Color: Canvas. o Tops to have new integral Corian 810P sink bowls. o Furnish and install any backing and/or braces as required for new countertops. o Caulk as needed. o Furnish and install new P-traps as required. o Patch and paint touch-up adjacent surfaces as required upon replacement of countertop and sinks. o Field verify all dimensions. o Wipe down and vacuum the work area prior to demobilization. Toilet Partitions o Demolish and dispose of existing toilet partitions from the Men's and Women's Main Highway Locker Rooms (Refer to "Exhibit B - Drawing HY-G"). o Remove and salvage existing restroom accessories and grab bars from existing toilet partitions. o Furnish and install new replacement toilet partitions. o New toilet partitions to match solid plastic partitions from a previous project at another County building (color to be Scranton, Sandcastle, Orange Peel). Refer to "Exhibit C - Specification Section 10 21 13" from the previous project. NOTE: the style of new partitions in the Men's and Women's Locker Rooms are to be floor mounted/overhead braced similar to the style that is currently installed there (NOT ceiling mounted). o Reinstall previously salvaged restroom accessories and grab bars on new partitions. o Patch and paint touch-up adjacent surfaces as required upon replacement of toilet partitions. o Field verify all dimensions. o Wipe down and vacuum the work area prior to demobilization

Award

Municipal

$33,332.00

Public - County

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
4
Bidding Soon
1,714
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2025

December 22, 2025

Project location map

1641 Woodburn Rd, Waukesha, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.