BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 16, 2025 at 8:00 PM

Updated October 31, 2025

Paving and renovation of an educational facility in Graniteville, South Carolina. Completed plans call for the renovation of a one-story above grade educational facility.

The project is the Midland Valley High School Re-Roofing. The work includes removal of the existing loose aggregate surfacing and preparation of the existing aggregate surfaced built-up roof systems on Roof Areas A, B, C, D, E, and F. The prepared areas are to receive a minimum 2-inch-thick pour of lightweight insulating concrete (LWIC) over a minimum 2-inch-thick expanded polystyrene insulation system, continuous across the entire roof areas, and installation of a new two-ply modified bitumen roof membrane system eligible for a manufacturer’s 20-year warranty.

Post-Bid

Educational

$5,000,000.00

Public - County

Paving, Renovation

10

11

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
1
Bidding Soon
453
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2025

December 15, 2025

Project location map

227 Mustang Dr, Graniteville, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.