BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 9, 2025 at 8:00 PM

Updated October 10, 2025

Site work for a water / sewer project in Salmon Arm, British Columbia. Conceptual plans call for site work for a water / sewer project.

Canoe storm sewer upgrades. The project extends from the Canoe Detention Pond to the Shuswap Lake outfall and will address critical capacity deficiencies in the trunk storm sewer system that were first identified in the 2007 Master Drainage Plan. The Master Plan recommends the following upgrades: Upgrade from 525 mm to 900 mm diameter pipe from the Canoe Detention Pond to 71 Avenue NE. Upgrade from 600 mm to 1200 mm diameter pipe along 48 Street NE from 71 Avenue to the west end of 73 Avenue. Upgrade from 900 mm to 1350 mm diameter pipe from the west end of 73 Avenue to Canoe Beach Drive NE and along Canoe Beach Drive NE to 50 Street NE. Upgrade from 900 mm to 1500 mm diameter from 50 Street NE to the outfall north of 75 Avenue NE. TIMELINE: Request for proposals from qualified consulting firms to complete detailed design services, has been issued by the owner. Further update in late 2025, upon award. *The estimated construction cost of the project is $2.9 million.

Conceptual

Water / Sewer

$2,900,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
21
Bidding Soon
243
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 23, 2026

Project location map

Multiple Locations, Salmon Arm, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.