BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 5, 2025 at 7:00 PM

Updated December 6, 2025

Site work and paving for a civil project in Roan Mountain, Tennessee. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Reference Number 0000401144 Question Deadline 10/21/2025 at 10:00 AM ET Questions are submitted online Yes various FEMA road site replacements for Laurel Highlands Laurel Highlands Site 1 (36.195457, -82.075573): Ditches, 3,600 SF of Ditch/Ravine funneled down a hill. Add large 3 ft. shot rock, 60 FT long x 60 FT deep, Flooding washed out the roadway Mitigation Laurel Highlands Rd 1 GPS: 36.195457, -82.075573 Replace 72 IN dia. x 60 LF CMP with 10G CMP. Pipe has been reported as sinking/crushing due to storm damages and was not visible during original site inspection due to depth under road. Pipe is located approx. 40 - 60 FT under road surface. Laurel Highlands Site 2 (36.195245, -82.076189): Shoulder, 124.4444 CY of Add 3 ft of Shot Rock, 4 shelves from the road down, 42 FT long x 4 FT wide x 20 FT deep, Flooding washed out the roadway. Mitigation: Replace existing 15 IN dia. cross drain with 24 IN dia. x 60 LF CMP. Laurel Highlands Site 3 (36.194773, -82.078353): Ditches, 648.8889 CY of Add 3 ft Shot Rock, 16-20 ft from the road down, the dimensions may change once construction begins., 73 FT long x 12 FT wide x 20 FT deep, Flooding washed out the roadway, 0% work completed. Mitigation: Use geotextile and rock to 'bench* (layer) the slope. Approx. 85 FT long x 20 FT wide x 35 FT deep. Each layer to be approx. 3 FT deep 80 LF x 20 FT high x 3 FT Rip Rap will be placed on top for protection. Replace existing 18 IN dia. cross drain with 24 IN dia. x 60 LF CMP. Ditches, 2,203.7037 CY of Add 3 ft Shot Rock, 16-20 ft from the road down, the dimensions may change once construction begins., 85 FT long x 20 FT wide x 35 FT deep, Flooding washed out the roadway, 0% work completed. Mitigation: Use geotextile and rock to 'bench* (layer) the slope. Approx. 85 LF long x 20 FT wide x 35 FT deep. Each layer to be approx. 4 FT deep 90 LF x 35 FT high x 3 FT Rip Rap will be placed on top for protection. Replace existing 18 IN dia. cross drain with 24 IN dia. x 60 LF CMP. approx, location GPS: 36.193928, -82.079353

Award

Roads / Highways

$730,660.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
4
Bidding Soon
912
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2025

November 26, 2025

Project location map

Laurel Highlands Rd, Roan Mountain, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.