BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 14, 2025 at 7:00 PM

Updated November 15, 2025

Demolition, site work and new construction of a water / sewer project in Freedom, Pennsylvania. Completed plans call for site work for a water / sewer project; and water / sewer project.

Project generally consists of, but is not limited to, construction of a new submersible style pump station with wet well, valve vault, control building, emergency generator platform, site piping and improvements, and related electrical work to replace the existing High Meadow Pump Station, and demolition of the existing pump station. The Project also includes the construction of approximately 3,600 feet of 16" HDPE force main, 90 feet of 12" PVC force main, 172 feet of 15" gravity sewer main and associated manholes and appurtenances. Separate Bids will be received for the following Contracts: Contract No. 2025-02 Pump Station General Construction; Contract No. 2025-03 Pump Station Electrical Construction; Contract No. 2025-04 Force Main & Gravity Sewer Construction. Prospective Bidders are urged to register with the designated website as a plan holder. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. The Owner reserves the right to waive any defects, errors, omissions, mistakes, informalities, to accept any bid or combination of bids that are deemed to be in the best interest of the Owner, and to reject any or all proposals. All bidders are notified that businesses will be afforded full opportunity to submit bids and will not be subjected to discrimination on the basis of gender, race, color, creed, sex, age, physical disability or national origin in consideration for an award. Similarly, the successful bidder shall not discriminate against or intimidate any employee involved in the performance of work or any required activity under the contract on account of gender, race, creed or color. Contract 2025-02: Pump Station General Construction $4,500,000 to $5,000,000 Contract 2025-03: Pump Station Electrical Construction $500,000 to $600,000 Contract 2025-04: Force Main & Gravity Sewer Construction $1,400,000 to $1,600,000. CoStars Contract Number: 016-E22-253 Questions deadline: 11/6/25 at 4:00 PM Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: All questions shall be submitted using Bidding Documents Website (PennBID) Questions received less than seven days prior to the date for opening of Bids may not be answered. General Construction: Sippel Development - $4,397,058.0 Electrical Construction: MONACACY VALLEY ELECTRIC - $454,692.00 Force Main & Gravity Sewer Construction: Sippel Development Co, Inc - $907,907.0

Bid Results

Water / Sewer

$5,759,657.00

Public - County

Demolition, New Construction, Site Work

11

28

43

5

Subscribe For Documents

66 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
12
Bidding Soon
1,607
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2025

January 12, 2026

Project location map

160 Lawnview Dr, Freedom, PA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.