BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 1, 2025 at 7:00 PM

Updated December 2, 2025

Renovation of an educational facility in Ann Arbor, Michigan. Completed plans call for the renovation of a educational facility.

OE Air Compressor Replacement Scope of Work The work of this bid category includes but is not limited to providing all labor, equipment, materials, scaffolding, hoisting and incidentals to complete the OE Air Compressor System Replacement in accordance with the specifications, drawings and applicable codes. All work is to be performed as shown on the drawing and material list and specified herein. THE SCOPE OF WORK IS TO INCLUDE, but is not limited to, the following items: A. Contractor to manage and coordinate with all other trades necessary to complete the work per specification. B. Contractor to coordinate all work for proper fit, location and clearance of piping, ductwork, equipment and accessories to ensure timely completion of work. C. Contractor to secure and pay for all required permits, licenses, inspections, approvals, and fees for the work. Contractor will coordinate all inspections with these entities and any others having jurisdiction over the project. D. Contractor to provide its own equipment and tools necessary to complete this contract. This includes all vertical lifts, forklift E. Contractor is responsible to manage all electrical sub-contractor work to be performed by licensed electrical contractor. F. Contractor to field verifies all dimensions and verifies quantity's need for this project. G. Contractor to furnish and install all pipe identification markers, tags, schedules, nameplates to identify ducts, pipes and mechanical equipment. H. Contractor to coordinate all new support steel layout and wall penetrations required for complete installation. I. Contractor to coordinate with WCC on timing and impacts to building. Contractor to include any premium time or off shift work required to complete system shutdowns and isolations. J. Contractor to seal all wall penetrations as needed, firestopping as required. K. All material and equipment that will be purchased as part of the project will be the responsibility of the Contractor to be delivered to the jobsite with just in time approach. NO deliveries will be accepted at WCC Shipping and Receiving. Any costs associated with returned items will be paid by Contractor. L. Contractor to provide protection and daily cleanup of work space and routes in and out of the work zones. M. Contractor is responsible for total removal and disposal of all waste generated from construction activities. WCC expectation is that contractor will attempt to separate and recycle as much as possible. Contractor to provide all dumpsters for the project. N. Contractor to provide startup support, testing and assistance for new equipment. O. Contractor to provide barricades, fencing required and signage to maintain required safety regulations as defined by OSHA. P. Contractor to coordinate and adhere to all state and local building codes relative to this contractor's work. This contractor is to obtain and pay for all special permits associated with the work. Q. Contractor to clean-up of all trash or construction debris is by the trade contractors daily. R. Contractor MUST comply with MI-OSHA requirements for this work. This will be closely monitored. S. Restrooms in facility will be available for use by contractor's employees. T. Contractor and all its sub-contractors are to observe the College's no smoking policy. U. Contractor and all subcontractor vehicles will be provided free parking at the Northern edge of Lot 3. Unloading areas for tools and materials will be available at the building on a temporary basis but this is a regulated Fire Lane. Bidders shall carefully examine the Contract Documents and the construction site to obtain first-hand knowledge of existing conditions. Successful bidder will be denied any application for extra payments for conditions which can be determined by visually examining the site and the Contract Documents. Pre-bid Meeting / Site Visit Each bidder shall inspect the site and become familiar with existing conditions and limitations of the site, means of access to the site and to work areas, relationship of existing and new work, and other conditions which might affect the proper performance and completion of the work. No allowance will be made after RFP opening for cost estimation errors attributable to any failure to account for existing conditions and/or consider of any and all limitations on or of this scope of work. Successful bidder will be denied any application for extra payments for conditions which can be determined by visually examining the site. Bidder's representative shall report to the Owner's Representative and register his name, phone number, and name of the company, signing in as verification of his site visit. The Owner is not obligated to offer any other times to conduct site visits. Any figured dimensions shown on the Contract Documents are for reference purposes only. The Contractor is required to verify and confirm all dimension in the field and report any discrepancies to the Owner's Representative immediately. Contractor's request for additional payment, additional time, or reconsideration of their bid will be denied if the claim is based on reliance on the figured dimensions shown on the Contract Documents only Question Deadline 10/21/2025 at 2:00 PM ET Questions must be directed to Don Harrison, Purchasing Agent at dharriso1@wccnet.edu. All communication should be directed to the Purchasing Department. Vendor should NOT contact any department directly with questions. All questions must be submitted. All emails must reference the bid number and title. All questions received by the deadline date will be answered and posted online by 10/22/25 at 2:00 p.m. EDT Should any bidder find discrepancies between the site markings and the Project Manual, or be in doubt as to their exact meaning, he should notify the Owner at once. The Owner may then, at his option, issue Addenda clarifying the same to all bidders. The Owner will not be responsible for oral instructions or for the Contractor's misinterpretations of the Contract Documents Bid Security, Bonds, and Insurance A. A Bid Bond is required in the amount of five percent (5%) of the total bid, minimum, and shall be enclosed with the Bid Proposal, for all base bids categories in excess of $50,000.00. B. Performance Bond and Payment Bond requirements are described in the General and/or Supplementary Conditions and are one hundred percent (100%) of the total bid, minimum, for all bids in excess of $50,000.00. C. Insurance requirements are described in the General and Supplementary Conditions. If you have any questions concerning this bid, please do not hesitate to contact the WCC Purchasing Department. It is the responsibility of the Contractor to ensure that bids are received at the location stated below on or before the due date and time. The college normal office hours are 8:00 AM to 4:30 PM EDST. The Contractor assumes all responsibility for delivery to the location given above regardless of the method of shipment and delivery used and the time received to the specified location on campus. Award of Contract A. Material proposals to be used for the completion of work, the competency, solvency, reputation, and responsibility of the bidders, start/completion/duration times, and other issues deemed relevant by the Owner and the Engineer will be considered. All responsible bidders will receive due consideration before the awarding of this contract. B. In the reception of proposals for the Work, the Owner incurs no obligation to accept the lowest priced proposal. C. The right to accept or reject any and all bids is reserved by the Owner. D. The Owner reserves the right to require testimony or legal documents pertaining to the qualifications of a Contractor. All work shall adhere to all specifications as outlined in the Contract Documents and Bid Drawings. This project is scheduled to begin December 16, 2025 with a date of final completion on or before January 2, 2026.

Award

Educational

$148,500.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
344
Active Projects
129
Bidding Soon
2,382
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2025

December 16, 2025

Project location map

4800 E Huron River Dr, Ann Arbor, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.