BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 12, 2025 at 7:00 PM

Updated November 13, 2025

Site work and paving for a bridge / tunnel in The Woodlands, Texas. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Scope Scope of Work of the Contract includes construction of 124 foot prefabricated steel truss pedestrian bridge; approximately 4,600 square feet of 5-foot (5') wide, 4.5-inch (4.5") thick concrete sidewalk; two (2) removable pipe bollards; site work; and all additional items shown on the construction plans or needed for the completely functional sidewalk and pedestrian bridge. Submit questions about bidding instruments to the Engineer Online. Bidders should contact the Engineer not less than 72 hours before bid opening to secure any addenda that may affect bidding.

Bid Results

Bridges / Tunnels

$568,778.00

Public - County

Paving, Site Work

49

31

2

3

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
375
Active Projects
200
Bidding Soon
3,520
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2025

December 5, 2025

Project location map

Birnham Woods Drive, The Woodlands, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.