BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 27, 2025 at 8:00 PM

Updated October 28, 2025

This is a service / maintenance or supply contract in Winchester Center, Connecticut. Contact the soliciting agency for additional information.

The Town of Winchester is soliciting qualification packages from qualified firms to provide professional services in support of the development of a comprehensive, town-wide Roadway Safety Action Plan. This initiative is funded through the U.S. Department of Transportation (USDOT)'s Safe Streets for All (SS4A) grant program and is subject to the federal QualificationsBased Selection (QBS) process. The Town of Winchester has been awarded a Demonstration and Planning Grant under the USDOT's SS4A program to develop a comprehensive Roadway Safety Action Plan (hereinafter referred to as the "Action Plan"). The Town seeks a qualified consultant to lead the development of this plan, which will serve as a holistic and well-defined strategy to prevent roadway fatalities and serious injuries in Winchester. The Action Plan will employ the Vision Zero framework and be designed to place Winchester on course to achieve its adopted goal of eliminating roadway fatalities and serious injuries by 2034, as approved by the Board of Selectmen in September 2024. The selected consultant will collaborate closely with the Town's SS4A Roundtable Committee, comprised of town staff and resident members who will provide input, guidance, and local perspective throughout the development of the Action Plan. The Town of Winchester reserves the right to accept or reject any or all responses, to waive technicalities or informalities, and to select the firm that best meets the needs and interests of the Town. The Town reserves the right to modify or terminate the selection process at any stage if deemed to be in its best interest. All aspects of this process will be conducted in compliance with state and federal requirements to ensure eligibility for funding. RFQ date notes: Each proposer shall submit four (4) hard copies of their complete qualifications package. All sealed packages must be clearly marked as "Roadway Action Plan Submission". Submissions must be received by the deadline listed on the first page of this RFQ. Late submissions will not be considered. Electronic submissions will not be accepted under any circumstances. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
781
Active Projects
442
Bidding Soon
4,351
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2026

Project location map

Multiple Locations, Winchester Center, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.