Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 30, 2025 at 7:00 PM
Updated December 31, 2025
Remodeling of an educational facility in Provo, Utah. Completed plans call for the remodel of a 13,583-square-foot educational facility.
Mountainland Technical College Provo Phase V Remodel. Furnish all labor, materials, and equipment necessary for the completion of the mechanical and plumbing scope of work. Furnish and install all motors specified in this Division and be responsible for the proper operation of electrical powered equipment furnished by this Division. Furnish exact location of electrical connections and information on motor controls to Division 26. Mechanical Contractor shall obtain the services of independent Test and Balance Agency. Placing the air conditioning, heating, ventilating, and exhaust systems into full operation and continuing their operation during each working day of testing and balancing. Making changes in pulleys, belts, and dampers, or adding dampers, as required for the correct balance as recommended by Balancing Contractor at no additional cost to Owner. Air balance, final adjustment and test run. The satisfactory performance of the completed systems is a requirement of this specification. All Subcontractors used by Contractor shall have secured, at their own expense, all necessary professional accreditations, registrations, and licenses in the state of Utah. Time is of the essence in the Contract Documents. DFCM will suffer damages that are difficult to ascertain for each calendar day the date for Substantial Completion is delayed. Therefore, as agreed damages and not as a penalty, DFCM may offset from any payments due Contractor the sum stated in the Contractor's Agreement, as augmented in Section 4.6.14.2 in the case of continuing delay, for each day Substantial Completion is delayed beyond the date established for Substantial Completion of the Work by the Contract Documents. Bonds means collectively the bid bond, performance bond, payment bond, and any other instruments of security. DFCM reserves the right to reject on reasonable ground any Subcontractor. Contractor shall not contract with any person or entity to whom DFCM has made reasonable objection. Contractor shall not be required to contract with anyone to whom Contractor has made reasonable and timely objection, provided that any additional costs associated with Contractor replacing a Subcontractor objected to by Contractor with a replacement Subcontractor not objectionable to Contractor shall be at no cost to DFCM. The Work of Project is defined by the Contract Documents and consists of the following: 1. Remodel of level three of an existing four-story higher education building, consisting of approximately 13,583 sq. ft. It is designed as a Type II-A, B Occupancy (Educational Occupancies for students above the 12th grade). Mechanical and electrical upgrades are also included in the scope of the work to accommodate the changes to the floor plan layout. No structural work is anticipated with non-rated infill framing and other Work indicated in the Contract Documents.
Post-Bid
Educational
$200,000.00
Public - State/Provincial
Remodeling
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 12, 2025
December 5, 2025
125 N 100 W St, Provo, UT
Related To This Project
Provo, UT
Bid Date: Oct 17 2025
Provo, UT
Bid Date: Oct 20 2025
Provo, UT
Bid Date: Nov 18 2025
Provo, UT
--
Provo, UT
Bid Date: Oct 16 2025
Provo, UT
--
Provo, UT
Bid Date: Oct 28 2025
Provo, UT
Bid Date: Oct 09 2025
Provo, UT
Bid Date: Oct 08 2025
Provo, UT
Bid Date: Oct 09 2025
Provo, UT
Bid Date: Oct 07 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
