BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 19, 2025 at 7:00 PM

Updated December 20, 2025

Site work and paving for a road / highway in Coleville, Saskatchewan. Design plans call for site work for a road / highway; and for paving for a road / highway.

The Saskatchewan Ministry of Highways is planning construction on Highway No. 21 from its junction with the Mendham Access Road to its junction with Highway 32. The total combined project length is approximately 12.64 km. Highway No. 21 C.S. 21-07 km 37.33 to km 49.97 - Preservation Heavy. TIMELINE: Planning and design work has commenced. Final tender document submission is expected in November 2026. Tender and construction timelines to be confirmed. *Budget is unreleased.

Design

Roads / Highways

$1,000,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
4
Bidding Soon
30
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2027

Project location map

SK-21, Coleville, SK


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.