Site work for a civil project in Crystal Lake, Illinois. Completed plans call for site work for a bridge / tunnel.

Installation/relocation of all impacted underground utilities (storm sewer, sanitary sewer, water main), installation of the far upstream and downstream reinforced concrete box culverts (RCBC) and headwalls, Soil Erosion/Sediment Control measures, and all necessary restoration. Phase 2: Installation of the remaining proposed reinforced concrete box culverts (RCBC) and headwalls, proposed creek grading and appurtenances for stabilization, Soil Erosion/Sediment Control measures, and all necessary restoration. Phase 1 Substantial Completion Date shall be August 1, 2026. Substantial Completion shall be defined as all work being completed from the St. Andrews Lane Culvert through Station 214+00, including all final grading, pavement restoration and striping, concrete, asphalt, and erosion control measures, as well as the Lakewood Storm Sewer re-routing (Station 214+00 to Station 219+00). Phase 1 Final Completion Date shall be August 28, 2026, which shall be defined as all work being completed from Station 214+00 to the Highland Avenue Culvert, including all punchlist items. Phase 2 Substantial Completion Date shall be August 7, 2027. Substantial Completion shall be defined as all culvert installation, underground, concrete, asphalt, final grading, creek fine grading and seeding, stabilization, pavement restoration, and erosion control measures. Phase 2 Final Completion Date shall be September 3, 2027, which shall be defined as all fence and gate installation, trees and shrubs, removal of erosion control measures, stabilization/restoration of stockpile areas, site cleanup, and punchlist items. Question Deadline 11/12/2025 at 3:00 PM CT All questions/comments/concerns from prospective bidders shall be submitted via online.

Post-Bid

Water / Sewer

$500,000.00

Public - City

Site Work

95

22

4

8

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
543
Active Projects
296
Bidding Soon
3,894
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2025

January 5, 2026

Project location map

St Andrews Ln & Nash Rd, Crystal Lake, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.