Published December 2, 2025 at 7:00 PM
Updated December 5, 2025
Site work for a civil project in Crystal Lake, Illinois. Completed plans call for site work for a bridge / tunnel.
Installation/relocation of all impacted underground utilities (storm sewer, sanitary sewer, water main), installation of the far upstream and downstream reinforced concrete box culverts (RCBC) and headwalls, Soil Erosion/Sediment Control measures, and all necessary restoration. Phase 2: Installation of the remaining proposed reinforced concrete box culverts (RCBC) and headwalls, proposed creek grading and appurtenances for stabilization, Soil Erosion/Sediment Control measures, and all necessary restoration. Phase 1 Substantial Completion Date shall be August 1, 2026. Substantial Completion shall be defined as all work being completed from the St. Andrews Lane Culvert through Station 214+00, including all final grading, pavement restoration and striping, concrete, asphalt, and erosion control measures, as well as the Lakewood Storm Sewer re-routing (Station 214+00 to Station 219+00). Phase 1 Final Completion Date shall be August 28, 2026, which shall be defined as all work being completed from Station 214+00 to the Highland Avenue Culvert, including all punchlist items. Phase 2 Substantial Completion Date shall be August 7, 2027. Substantial Completion shall be defined as all culvert installation, underground, concrete, asphalt, final grading, creek fine grading and seeding, stabilization, pavement restoration, and erosion control measures. Phase 2 Final Completion Date shall be September 3, 2027, which shall be defined as all fence and gate installation, trees and shrubs, removal of erosion control measures, stabilization/restoration of stockpile areas, site cleanup, and punchlist items. Question Deadline 11/12/2025 at 3:00 PM CT All questions/comments/concerns from prospective bidders shall be submitted via online.
Post-Bid
Water / Sewer
$500,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 4, 2025
January 5, 2026
St Andrews Ln & Nash Rd, Crystal Lake, IL
Related To This Project
Crystal Lake, IL
Bid Date: Oct 30 2025
Crystal Lake, IL
Bid Date: Oct 31 2025
Crystal Lake, IL
Bid Date: Nov 07 2025
Crystal Lake, IL
Bid Date: Oct 24 2025
Crystal Lake, IL
Bid Date: Nov 06 2025
Crystal Lake, IL
Bid Date: Nov 12 2025
Crystal Lake, IL
Bid Date: Nov 17 2025
Crystal Lake, IL
Bid Date: Dec 19 2025
Crystal Lake, IL
Bid Date: Oct 28 2025
Crystal Lake, IL
Bid Date: Dec 03 2025
Crystal Lake, IL
Bid Date: Oct 08 2025
Crystal Lake, IL
--
Crystal Lake, IL
Bid Date: Oct 16 2025
Crystal Lake, IL
Bid Date: Sep 18 2025
Crystal Lake, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.