Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 14, 2025 at 8:00 PM
Updated October 15, 2025
Demolition, site work and paving for a mixed-use development in Millbrook, New York. Conceptual plans call for the demolition of a bridge / tunnel; for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
This project will remove the existing structure that carries Route 82 over the Metro North Rail Line in Hopewell Junction in the Town of East Fishkill in Dutchess County to create an at-grade crossing of Route 82 with the Metro North Railroad service track to the Hopewell Yard. The work will also include the installation of a pedestrian culvert to reroute pedestrian traffic from the Empire State Trail under Route 82 north of the existing bridge location. The project will also replace the existing signalized intersection of Route 82 and Beekman Road with a single lane roundabout to improve safety and operations. NYSDOT Region: 08 Hudson Valley The current status of the project is In Development. The Bid Opening is expected to be in Winter 2026/2027. Construction is expected to begin in Spring 2027. Construction is expected to be completed in Fall 2028. As of October 14, 2025, the project is in Conceptual status. Anticipated letting Year is 2026. NYDOT : Route 82 Over Mnr Bridge Removal, Hopewell Junction: T/o East Fishkill *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$8,000,000.00
Public - State/Provincial
Demolition, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
NY-82, Millbrook, NY
Related To This Project
Millbrook, NY
Bid Date: Oct 08 2025
Millbrook, NY
--
Millbrook, NY
Bid Date: Sep 11 2025
Millbrook, NY
Bid Date: May 30 2025
Millbrook, NY
Bid Date: Sep 16 2021
Millbrook, NY
--
Millbrook, NY
--
Millbrook, NY
--
Millbrook, NY
Bid Date: Nov 14 2024
Millbrook, NY
Bid Date: Sep 24 2024
Millbrook, NY
Bid Date: May 15 2024
Millbrook, NY
Bid Date: May 15 2024
Millbrook, NY
Bid Date: May 15 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
