BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 21, 2025 at 7:00 PM

Updated December 2, 2025

Renovation of a playground / park / athletic field in Vista, California. Completed plans call for the renovation of a playground / park / athletic field.

The Work generally consists of: The renovation of four existing restroom structures located within Brengle Terrace Park as identified in the exhibits. The work involves the removal of existing toilet fixtures, toilet accessories, partitions, grab bars, doors, window security bars, fixtures, drinking fountain, bottle fillers, lights, exhaust fans and other misc. items as identified and replacement in kind with specified products. The work also includes the complete painting of all interior and exterior structures including all facia, trim, walls, and ceilings including repair and deteriorated facia and beams as needed. The replacement work shall include and is not limited to plumbing actuated devices and necessary modifications of masonry as needed and electrical upgrades including all mechanical components as needed within the restroom facility and chase rooms. Restroom #1 consists of a masonry structure on the backside of the recreational facility. Bathroom partitions are masonry with a wood ceiling. Restroom #2 consists of a prefabricated concrete restroom building constructed by CXT. All replacement parts should be available through CXT or the contractor may choose to manufacture or purchase replacement parts elsewhere as long as they conform to the existing quality or space requirements. Restroom #3 is a combination masonry/wood octagon shaped structure with half of the structure being utilized for restrooms and the other half for a picnic/shelter area. The entire structure should be considered as part of the restroom renovations including the drinking fountain, bottle filling station, maintenance facility doors and any other misc. portions of the structure. Restroom #4 also consists of a prefabricated concrete restroom building constructed by CXT. All replacement parts should be available through CXT or the contractor may choose to manufacture or purchase replacement parts elsewhere as long as they conform to the existing quality or space requirements. Failure to view the project site will not result in an opportunity for change order based on unknown conditions. The scope of the Project and the bidding requirements are reviewed by the Agency and comments and questions from prospective bidders are discussed. PROSPECTIVE BIDDERS ARE ENCOURAGED TO ATTEND. Question Submission Deadline:October 23, 2025, 12:00pm Question Response Deadline:October 27, 2025, 3:00pm Contractor Selection Date:December 9, 2025

Award

Playgrounds / Parks / Athletic Fields

$354,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
180
Active Projects
14
Bidding Soon
2,241
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2025

December 3, 2025

Project location map

1200 Vale Terrace Dr, Vista, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.