Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 12, 2025 at 7:00 PM
Updated November 21, 2025
Site work for a water / sewer project in Sumter, South Carolina. Completed plans call for site work for a water / sewer project.
The work to be done consists of furnishing all materials, equipment and labor necessary to repair and repaint the existing 300,000-gallon Highway 441 elevated water tank and related work. This project is being funded in part by a grant from the SC Rural Infrastructure Authority (SCRIA). The Information for Bidders, Bid Form, Contract, Plans, Specifications, Bid Bond, Performance Bond and Payment Bond, and other contract documents may be examined at the following locations: Sumter County Water Utility, 1289 N. Main Street, Sumter, SC 29153 High Hill Rural Water Company, 2720 Peach Orchard Road, Dalzell, SC 29040 Engineers: Summit Engineering Group, Inc., Spartanburg, SC. Doc Note: When requesting drawings, specifications and contract documents, provide the following information about your company: Mailing address; street (UPS) address; telephone number; and FAX number (if applicable). Partial sets of Bidding Documents will not be available. Neither the Owner nor the Engineer will be responsible for the accuracy or completeness of Bidding Documents, including Addenda (if any), obtained from other sources. Bidders must be on the Engineer's official plan holders list for bids to be accepted by the Owner. Bidders must deposit security with all bids. Security shall be in the form of a certified check or bid bond made payable to the Owner and shall be for an amount equal to not less than five percent of the amount of the bid. Provisions of the security shall be as described in the Information for Bidders. No bid will be considered unless the bidder is legally qualified under the provisions of the South Carolina Contractor's Licensing Law (South Carolina Code of Laws as amended on April 1, 1999, Chapter 11, Sections 40-11-10 through 40-11-428). Contractors shall have a classification of WL. No bidder may withdraw the bid within ninety days after the actual date of the opening and thereof. The Owner reserves the right to waive any informalities or to reject any or all bids Question Deadline 11/14/2025 No interpretation of the meaning of the plans, specifications or other pre-bid documents will be made to any bidder orally. Each request for such interpretation should be in writing, addressed to Summit Engineering Group, Inc., 9601 Warren H. Abernathy Highway, Spartanburg, South Carolina 29301. To be given consideration, the request must be received at least five days prior to the date fixed for the opening of bids.
Post-Bid
Water / Sewer
$450,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
10
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 20, 2025
December 22, 2025
State Hwy 441, Sumter, SC
Related To This Project
Sumter, SC
Bid Date: Nov 19 2025
Sumter, SC
Bid Date: Nov 12 2025
Sumter, SC
Bid Date: Nov 10 2025
Sumter, SC
--
Sumter, SC
Bid Date: Nov 20 2025
Sumter, SC
--
Sumter, SC
Bid Date: Nov 13 2025
Sumter, SC
Bid Date: Dec 04 2025
Sumter, SC
Bid Date: Oct 28 2025
Sumter, SC
Bid Date: Nov 12 2025
Sumter, SC
Bid Date: Nov 12 2025
Sumter, SC
Bid Date: Nov 12 2025
Sumter, SC
Bid Date: Nov 04 2025
Sumter, SC
Bid Date: Oct 23 2025
Sumter, SC
Bid Date: Oct 28 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
