BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 24, 2025 at 7:00 PM

Updated November 25, 2025

Site work for a playground / park / athletic field in Holly Hill, Florida. Completed plans call for site work for a one-story above grade playground / park / athletic field.

The City of Holly Hill is seeking bids for the provision and installation of a new playground system. The playground and all associated equipment must fit within a designated area measuring 68 feet by 39 feet and comply with applicable Florida statutes and codes. The project includes installation of safety surfacing in accordance with all required safety standards, supply and installation of playground equipment and a surrounding border. Playground design should be for school age children from 5-12 years old. An ADA-compliant access ramp must connect to an existing sidewalk and provide inclusive access to the playground. The site must be fully enclosed by a fence. The City will remove the existing playground on site as well as remove as much playground mulch as possible. All metal components must be stainless steel or hot-dipped galvanized due to the site's proximity to the Halifax Intracoastal Waterway. This project is subject to a fixed budget of $102,966. Bids will be evaluated based on the quality and quantity of equipment offered, materials used, and warranties provided. The City of Holly Hill is seeking bids for the provision and installation of a complete playground system. The scope of work includes the supply and installation of playground equipment, playground safety surfacing, and a surrounding border. The design must include an ADA-compliant ramp to ensure accessibility for all users. This project is being offered with a fixed budget of $102,966. Determination of the winning bidder will be based on the amount and quality of the playground equipment offered, use of corrosion resistant materials and warranty coverage. All questions should be directed in writing to mmearsheimer@hollyhillfl.org. Questions to be submitted no later than 5:00 pm on October 27, 2025.

Bid Results

Playgrounds / Parks / Athletic Fields

$97,836.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
259
Active Projects
118
Bidding Soon
1,832
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2025

December 3, 2025

Project location map

611 Riverside Dr, Holly Hill, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.