Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 18, 2025 at 7:00 PM
Updated November 19, 2025
Site work for a civil project in Westminster, Maryland. Completed plans call for site work for a bridge / tunnel; and water / sewer project.
The project consists of removal of the existing Cell 3 stormwater diversion berm (aka rain flap) and associated stormwater conveyance piping; restoration of landfill liner (if applicable), geosynthetics, and landfill protective cover aggregate; removal of two (2) associated stormwater conveyance culverts, restoration of protective cover aggregate, cover soils and vegetation where pipes were removed; removal of silt-impacted protective cover aggregate within Cell 3 and replacement with clean aggregate to design specifications. Please refer to the bid documents for additional detail. Question Deadline 10/24/2025 Contractors must submit questions through the Public Purchase web site, The scope ofwork includes the removal of an existing HDPE liner rain flap stormwater diversion berm that is dividing the active and inactive waste disposal area within Cell 3 at the Carroll County Northern Landfill. Also, as part ofthis project an existing stormwater culvert(s) and geomembrane sump will be removed. The work includes, but is not limited to, the following: Removal of the existing temporary stormwater separation berm where shown on the drawings. 2. Removal of existing protective cover aggregate and staging for replacement after removal ofrain flap. 3. Upon exposing existing drainage composite, it shall be cut (hook blade knife) and peeled back to expose the existing primary liner. 4. Cut the 16 oz.SY non-woven cushion geotextile as shown on the Construction Drawing. 5. Perform nondestructive testing of existing extrusion weld. 6. "Connect" existing drainage geocomposite where the rain flap weld was exposed and cut. 7. Replace staged protective cover aggregate back over cushion geotextile/ geocomposite. 8. Remove and replace silted protective cover aggregate as directed by OWNER or their representative. 9. Remove the existing stormwater culverts and geomembrane sump line.* 10. Cleanup ofwork area and restoration of any other areas disturbed during the course of performing the work.
Award
Water / Sewer
$164,520.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 29, 2025
November 28, 2025
Multiple Locations, Westminster, MD
Related To This Project
Westminster, MD
--
Westminster, MD
--
Westminster, MD
Bid Date: Nov 14 2025
Westminster, MD
Bid Date: Dec 19 2025
Westminster, MD
Bid Date: Nov 12 2025
Westminster, MD
Bid Date: Oct 16 2025
Westminster, MD
Bid Date: Oct 29 2025
Westminster, MD
Bid Date: Oct 21 2025
Westminster, MD
Bid Date: Sep 23 2025
Westminster, MD
Bid Date: Sep 25 2025
Westminster, MD
Bid Date: Aug 29 2025
Westminster, MD
Bid Date: Aug 27 2025
Westminster, MD
Bid Date: Aug 27 2025
Westminster, MD
--
Westminster, MD
Bid Date: Aug 20 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.