BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 18, 2025 at 7:00 PM

Updated November 19, 2025

Site work for a civil project in Westminster, Maryland. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

The project consists of removal of the existing Cell 3 stormwater diversion berm (aka rain flap) and associated stormwater conveyance piping; restoration of landfill liner (if applicable), geosynthetics, and landfill protective cover aggregate; removal of two (2) associated stormwater conveyance culverts, restoration of protective cover aggregate, cover soils and vegetation where pipes were removed; removal of silt-impacted protective cover aggregate within Cell 3 and replacement with clean aggregate to design specifications. Please refer to the bid documents for additional detail. Question Deadline 10/24/2025 Contractors must submit questions through the Public Purchase web site, The scope ofwork includes the removal of an existing HDPE liner rain flap stormwater diversion berm that is dividing the active and inactive waste disposal area within Cell 3 at the Carroll County Northern Landfill. Also, as part ofthis project an existing stormwater culvert(s) and geomembrane sump will be removed. The work includes, but is not limited to, the following: Removal of the existing temporary stormwater separation berm where shown on the drawings. 2. Removal of existing protective cover aggregate and staging for replacement after removal ofrain flap. 3. Upon exposing existing drainage composite, it shall be cut (hook blade knife) and peeled back to expose the existing primary liner. 4. Cut the 16 oz.SY non-woven cushion geotextile as shown on the Construction Drawing. 5. Perform nondestructive testing of existing extrusion weld. 6. "Connect" existing drainage geocomposite where the rain flap weld was exposed and cut. 7. Replace staged protective cover aggregate back over cushion geotextile/ geocomposite. 8. Remove and replace silted protective cover aggregate as directed by OWNER or their representative. 9. Remove the existing stormwater culverts and geomembrane sump line.* 10. Cleanup ofwork area and restoration of any other areas disturbed during the course of performing the work.

Award

Water / Sewer

$164,520.00

Public - County

Site Work

4

18

8

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
476
Active Projects
219
Bidding Soon
3,237
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2025

November 28, 2025

Project location map

Multiple Locations, Westminster, MD


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.