BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 14, 2026 at 8:00 PM

Updated August 20, 2026

Site work for a civil project in Arrowwood, Alberta. Design plans call for site work for a bridge / tunnel.

BF01293, Bridge Replacement and Other Work, Carrying Hwy 547:04 Over Bow River (NE 9-21-23-W4M) (Construction WAC0009728). TIMELINE: Designs are ongoing. Project is tentatively scheduled for construction in 2033. Further update early 2027.

Design

Bridges / Tunnels

$36,000,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
42
Bidding Soon
559
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2033

Project location map

AB-547, Arrowwood, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.