Published December 3, 2025 at 7:00 PM
Updated December 4, 2025
Demolition and site work for a residential development in Jefferson City, Missouri. Completed plans call for the demolition of a residential development; and for site work for a residential development.
Demolition of 101 Jackson Street Question Deadline 10/27/2025 at 4:00 PM CT Online Portal A. Contractor shall provide all labor, materials, supplies, equipment, and incidentals needed to perform demolition services of the above listed structures. B. Contractor shall complete and submit a demolition permit application to the City (including a plan for erosion control if needed) for review and approval. o Contractors are responsible for submitting and paying the city demolition permit fee. The fee is $105.00. Contractor shall comply with all terms and requirements of the permit and hold the City of Jefferson harmless for failure to do so. o MDNR must be contacted by the successful bidder before work begins. Contractor shall provide documentation to the City's Building Official. Asbestos inspection and asbestos abatement have previously been completed. o Lot shall be cleared of all rubbish and all unsafe or hazardous conditions which endanger the life or health of the public C. All utilities (gas, electric, water, and sewer) shall be disconnected and removed from the structure in accordance with utility company standards before work is started. Documentation of utility signoffs shall be provided to the City's Building Official. No cutting of any City street is allowed without prior Public Works permission. See Exhibit 4 for the application for street cut. D. Sewer lateral shall be disconnected and plugged at the main by a Jefferson City licensed plumbing contractor. The contractor shall contact the Plumbing Inspector when the sewer lateral is plugged for verification. E. Water service line shall be disconnected and plugged at the tap/main by a Jefferson City licensed plumbing contractor. The contractor shall contact the water utility and the Plumbing Inspector when the water service is plugged for verification. F. It is the sole responsibility of the contractor to obtain releases from all utility companies serving the structure(s) stating that their respective service connections and appurtenant equipment have been removed or sealed and plugged in a safe and acceptable manner. G. Contractor shall completely remove and dispose of the structure and all debris and other trash items on the lot. The contractor shall abide by the City's exclusive rights solid waste contract with Republic Services. Only Republic Services may provide roll off containers and haul to landfill. No third-party haulers may be utilized to haul waste material. Removal and disposal shall be in accordance with MDNR regulation, Chapter 260, RSMO. H. All exposed concrete flatwork, stone and asphalt shall be removed. The foundation and basement slab shall be removed entirely prior to fill. I. The basement shall be filled with material that can be consolidated. This may be well graded base rock or gravel screenings or other suitable material that can be "walked in" or consolidated by other methods (the driveway asphalt in less than 6-inch cubes may be used if worked into the other backfill). The contractor shall not allow wood, brick, shingles, organic or other demolition material from the structure to be used as fill for the basement. Proposed fill material other than that listed for backfilling shall be submitted for approval no less than five (5) working days prior to receipt of bids. Call the Building Official for inspection prior to backfilling the basement. J. All public sidewalks and concrete parking lot area in front of the property shall remain in place. Any public sidewalk damaged in the demolition process shall be removed and reconstructed at the contractor's expense. K. Only trees blocking access to structures should be removed to facilitate demolition of the existing structure. Stumps shall be ground to surface level. L. Tree branches and other debris shall be removed from the site including a large section of trees across the rear of property. Permission to access the property at 103 Jackson has been obtained to allow removal of entire branch. M. After demolition, disturbed areas of the site shall be covered with at least 6" of clean soil. Lot shall be graded to match the existing slope and property lines. The final grade shall not allow the accumulation of water (ponding) and shall facilitate mowing of the entire site. The property shall be seeded and mulched with straw punched to prevent blowing. Any sediment controls, such as silt fence, shall remain in place and be maintained by the contractor until grass is established on a minimum of 70% of the disturbed area to prevent sediment from being transported off-site. N. Any work requiring the closure of any portion of a street shall require the approval of a written traffic control plan. Said plan shall be developed by the contractor and approved by the Director of Public Works or his designee. If the contractor's plan requests the closure of one or more driving lanes of a street, for any length of time, said plan shall be developed by a registered professional engineer. See Exhibit 4 - Street Cut - Right of Way Permit Form. O. Contractor shall have a City business license; attend a pre-demolition meeting with City personnel to discuss construction staging, construction schedule, and provide a Certificate of Insurance in order to receive a Notice to Proceed. P. Work shall proceed continuously until complete. All work shall be completed within 14 workdays from the Notice to Proceed. A workday does not include Saturdays, Sundays or City of Jefferson Holidays. Also, this time includes five (5) inclement weather days. A weather day is considered when 50% of the scheduled work that day cannot be accomplished and shall be documented. Q. This project is federally funded through the CDBG-CV program. Contractors shall abide by all required Federal, State and Local laws and conditions as attached. See Exhibit 3 - HUD Federal Terms.
Bid Results
Residential Subdivision
$18,642.00
Public - City
Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 4, 2025
December 4, 2025
101 Jackson St, Jefferson City, MO
Related To This Project
Jefferson City, MO
--
Jefferson City, MO
Bid Date: Nov 06 2025
Jefferson City, MO
Bid Date: Dec 02 2025
Jefferson City, MO
--
Jefferson City, MO
Bid Date: Nov 21 2025
Jefferson City, MO
Bid Date: Nov 13 2025
Jefferson City, MO
Bid Date: Nov 21 2025
Jefferson City, MO
Bid Date: Nov 13 2025
Jefferson City, MO
Bid Date: Oct 30 2025
Jefferson City, MO
Bid Date: Oct 28 2025
Jefferson City, MO
Bid Date: Oct 17 2025
Jefferson City, MO
Bid Date: Nov 18 2025
Jefferson City, MO
Bid Date: Oct 07 2025
Jefferson City, MO
Bid Date: Oct 28 2025
Jefferson City, MO
Bid Date: Nov 10 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.