BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2025 at 7:00 PM

Updated November 27, 2025

Site work for a water / sewer project in Colesville, Maryland. Completed plans call for site work for a water / sewer project.

Project work includes The Work to be performed under this Task Order consists of the repair, rehabilitation, or replacement of 1018 LF (0.19 miles) of defective sewer mains; 767 LF (0.15 miles) of defective sewer laterals, and five (5) manholes located in the Paint Branch Basin. Time for substantial completion shall be 140 days, which shall commence on the date set forth in the Notice to Proceed. Question Deadline 10/28/2025 at 2:00 PM ET - All questions pertaining to the Solicitation or Contract Documents shall only be submitted via the eProcurement Portal MBE/SLBE Goal: 24%

Bid Results

Water / Sewer

$849,950.00

Public - City

Site Work

3

17

7

4

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
13
Bidding Soon
1,980
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2025

January 20, 2026

Project location map

Buckley Dr, Colesville, MD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.