Site work for a water / sewer project in Charleston, South Carolina. Completed plans call for site work for a water / sewer project.
This project involves the removal and replacement of an improperly installed sink drain system. The existing installation includes inconsistent pipe sizing, poor hanger placement, and the use of multiple incompatible pipe materials. The goal is to install a uniform, code-compliant, and professionally supported drainage system. Existing Conditions o Drainpipe transitions from 4" to 3" without proper reducers or justification. o Pipe hangers are poorly installed, leading to sagging and misalignment. o Three different types of piping materials are used. o Overall installation lacks uniformity and does not meet professional standards. o Piping leaks and has been leaking for some time and has damaged the ductwork it is laying on. Scope of Work Demolition & Removal o Disconnect and remove all existing sink drain piping. o MUSC will lockout sinks and RO system that dumps into that drain. o Safely dispose of all removed materials in accordance with local regulations. o Demo will happen last to minimize the downtime for lab sinks. Installation o Install new drain piping using uniform material. o 4" Orion PVC for 3" lines. The 2" lines may be able to go back in as 2" (Access on site) o Ensure consistent pipe sizing throughout the system (e.g., maintain 4" diameter unless otherwise justified by code). o New pipe would need to go through the ceiling on the 2nd floor to be tied in. I want to remove the glass elbow. o Install proper reducers if size transitions are necessary, with justification and code compliance. o Secure all piping with code-compliant hangers spaced. o Ensure proper slope for drainage (typically 1/4" per foot). o Seal all joints using approved methods. o Provide your own plank to work on to distribute weight across the ductwork. Testing & Inspection oPerform leak and flow tests to ensure system integrity. Materials Required (based on current design) o Approximately 30' of 4" S40 Orion PVC o Approximately 10' of 2" S40 Orion PVC o All fittings to create correct drainage slope for 2" pipe o Approximately three 4" elbows o One 4" reducing Tee (4 to 2)
Post-Bid
Water / Sewer
$300,000.00
Public - State/Provincial
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 27, 2025
November 17, 2025
Multiple Locations, Charleston, SC
Related To This Project
Charleston, SC
Bid Date: Nov 25 2025
Charleston, SC
Bid Date: Jan 29 2026
Charleston, SC
Bid Date: Nov 11 2025
Charleston, SC
Bid Date: Dec 09 2025
Charleston, SC
Bid Date: Nov 17 2025
Charleston, SC
Bid Date: Dec 09 2025
Charleston, SC
Bid Date: Dec 12 2025
Charleston, SC
Bid Date: Nov 13 2025
Charleston, SC
Bid Date: Oct 27 2025
Charleston, SC
Bid Date: Oct 31 2025
Charleston, SC
Bid Date: Oct 22 2025
Charleston, SC
Bid Date: Oct 30 2025
Charleston, SC
Bid Date: Oct 28 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.