BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 3, 2025 at 7:00 PM

Updated December 5, 2025

Renovation of a playground / park / athletic field in Goldsboro, North Carolina. Completed plans call for the renovation of a playground / park / athletic field.

**As of November 10, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** DESCRIPTION a. The City of Goldsboro Parks & Recreation Department, Herman Park, Park House, located at 900 Park Ave, Goldsboro, NC 27530. b. The project consists of exterior work including pressure washing, replacing rotten siding, demolition and replacing portions of the porch, reglazing and repairing windows, repairing rodent holes, replacing doors and jams, caulking and painting the building, and interior work including replacing a circulation fan, painting entire interior, installing LVP flooring and quarter round. The contractor will be responsible for conducting the repairs in accordance with the scope of work provided. 2. EXTENT OF WORK a. Provide all labor, material, tools, equipment, and supervision necessary to complete the work. b. The contractor shall be fully knowledgeable of all requirements of the contract documents and shall make themselves aware of all job site conditions that will affect their work. c. The contractor shall confirm all given information and advise the building owner, prior to bid, of any conflicts that will affect their cost proposal. d. Project must be completed to the owner's satisfaction, within sixty (60) calendar days after notice to proceed. Work must be continuous until complete. Work will not be allowed on weekends and holidays observed by the City of Goldsboro. Phase 2 Building Interior a. Remove an existing exhaust fan located 24' high & install a new thermostat-controlled exhaust fan wired permanently into the buildings electrical. Use of scaffolding is required. b. Prepare and paint two (2) restroom ceilings with color that matches the existing paint. c. Prepare and paint all interior walls, trim, ceilings, windows & doors. Colors shall match the existing color of the items being painted. d. Install new LVP waterproof flooring & Quarter Round Trim. Deadline for submission of questions 11/24/2025 2:00 p.m Questions: Email to: twood@goldsboronc.gov Award contract 12/12/2025 Notice to Proceed 12/19/2025 Project Substantial Completion 3/20/2026

Post-Bid

Playgrounds / Parks / Athletic Fields

$60,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
123
Bidding Soon
1,541
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2025

December 19, 2025

Project location map

900 Park Ave, Goldsboro, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.