BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 19, 2025 at 7:00 PM

Updated November 22, 2025

Site work for a water / sewer project in Oceanside, California. Completed plans call for site work for a water / sewer project.

The Work includes restoring approximately 16 linear feet of existing walking trail, including excavation, compaction, installation of geotextile fabric, concrete curb with re-bar, stone, mortar, permeable pavers, pipe extension for existing weep holes, coring and grouting, and the pouring of concrete slurry. Reference Number 0000398901 Question Deadline 11/05/2025 at 5:00 PM CT Questions are submitted online Yes Job Location Near the intersection of the Strand and Wisconsin Avenue The proposed work includes restoring approximately 16 linear feet of existing walking trail. This will involve mobilization and demobilization, implementation of water pollution control measures, acquisition of necessary permits, preparation of traffic control plans, and execution of traffic control. Pre-construction documentation will be completed through videos and photographs, and public notifications will be issued as required. Site activities will include excavation and site preparation, followed by compaction and installation of geotextile fabric. Slurry materials will be furnished and installed to support the structural base. The restoration will also include furnishing and installing permeable pavers and a 6" concrete curb with rebar reinforcement. Stone and mortar will be placed as specified. The scope also includes coring of the existing concrete pad and grout injection of the existing concrete pad as specified. The Work includes restoring approximately 16 linear feet of existing walking trail, including excavation, compaction, installation of geotextile fabric, concrete curb with re-bar, stone, mortar, permeable pavers, pipe extension for existing weep holes, coring and grouting, and the pouring of concrete slurry. General Requirements - Certified Payroll - Contractors License Required - Prevailing Wage Required Bonding Requirements Buyer Requires E-Bonding - Bid Bond 10 % - Performance Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 % Liquidated Damages: Per Section 7 of the General Provisions, Subsection 7.24, the Liquidated Damages for failure of the CONTRACTOR to complete the work within the Contract Time set forth in Subsection 1.3.4 and Section 6, Notice to Proceed are in the sum of one thousand five hundred dollars ($1,500) per consecutive day in excess of the contract time. Time is of the essence in the performance of work under this contract. All work shall be completed in every detail to the satisfaction of the Engineer, exclusive of Maintenance Periods, after the commencement date set forth in the Notice to Proceed, within forty-days (40) working days.

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

5

10

6

Subscribe For Documents

70 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
628
Active Projects
282
Bidding Soon
3,478
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2025

December 22, 2025

Project location map

Wisconsin Ave & S The Strand, Oceanside, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.