Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 9, 2025 at 7:00 PM
Updated December 10, 2025
Renovation of a mixed-use development in Beckley, West Virginia. Working plans call for the renovation of a medical facility.
The project involves comprehensive infrastructure upgrades at the Beckley VA Medical Center to support EHRM implementation. Work includes electrical improvements such as panel upgrades, normal and emergency power, bonding, UPS installation, and integration with the Building Management System. HVAC systems will be upgraded, and existing spaces will be reconfigured, expanded, and renovated, including demolition, new construction, finishes, and cabling to develop telecommunications rooms and ensure full coverage for each floor of every building. Communication infrastructure will be enhanced with new data outlets, patch panels, and Cat 6A cable upgrades. Additional tasks include physical security improvements, installation of a fiber backbone across the campus and between buildings, providing a diversified WAN path, and hazardous material abatement. Infection control measures will be implemented as required by construction documents. Demolition and hazardous material abatement will be performed in accordance with project specifications. Buildings impacted by these upgrades include 1, 2, 3, 4, 5, 6, 7, 8, 14/15, 17, 29, 35, and the parking garage. **Location:** Beckley VA Medical Center, 200 Veterans Avenue, Beckley, WV 25801. the magnitude of construction is between $10,000,000.00 and $20,000,000.00. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Medical
$20,000,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 12, 2026
200 Veterans Ave, Beckley, WV
Related To This Project
Beckley, WV
Bid Date: Nov 12 2025
Beckley, WV
Bid Date: Nov 05 2025
Beckley, WV
Bid Date: Dec 01 2025
Beckley, WV
Bid Date: Jan 13 2026
Beckley, WV
Bid Date: Jan 12 2026
Beckley, WV
Bid Date: Jan 07 2026
Beckley, WV
Bid Date: Oct 31 2025
Beckley, WV
Bid Date: Oct 27 2025
Beckley, WV
Bid Date: Oct 23 2025
Beckley, WV
Bid Date: Oct 14 2025
Beckley, WV
Bid Date: Oct 08 2025
Beckley, WV
Bid Date: Sep 15 2025
Beckley, WV
Bid Date: Sep 10 2025
Beckley, WV
Bid Date: Dec 16 2025
Beckley, WV
Bid Date: Sep 15 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
