BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 17, 2025 at 8:00 PM

Updated October 29, 2025

This is a service / maintenance or supply contract in Fort Peck, Montana. Contact the soliciting agency for additional information.

Western Area Power Administration requires various materials for restock to support Phase 12 of the Wolf Point to Poplar 115kV transmission line rebuild. All materials must be delivered to Fort Peck, Montana, FOB Destination. This procurement is set aside 100% for small businesses. It is not a brand name sole source; however, if quoting products other than the specified brand, vendors must include adequate descriptive literature for a complete review. Additionally, quotes must specify the country of manufacture and delivery lead time. Quotes lacking this information will not be considered.

Post-Bid

Military

Public - Federal

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
0
Bidding Soon
13
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 28, 2025

November 27, 2025

Project location map

14 N Bighorn St, Fort Peck, MT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.