BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 5, 2025 at 7:00 PM

Updated December 6, 2025

Demolition, site work, renovation and addition to an educational facility in Allen, Texas. Completed plans call for the addition of a one-story above grade educational facility; for the demolition of a one-story above grade educational facility; for the renovation of a educational facility; and for site work for a educational facility.

The scope of work includes a complete renovation of the existing kitchen at Beverly Elementary. This involves demolition of walls, ceiling, floor, and underground plumbing in the kitchen area only; installation of new underground plumbing; new concrete kitchen floor and tile; new walls and ceiling; all new finishes in the kitchen; installation of all new kitchen equipment, lights, hood assemblies, mechanical systems; and a new building addition for a cooler and freezer assembly, new grease interceptor, and new sanitary line. Main building work will include removal of existing toilet partitions and installation of new partitions, complete mechanical system controls replacement, and installation of a new digital marquee. Instructions to bidders state that proposals must be sealed, labeled with the proposal name and RFP number, and received at the specified district purchasing department address by the stated deadline. The procurement is Construction Manager at Risk, One Step Process. Proposals received after the deadline will be rejected. Proposers are responsible for obtaining all addenda, which will be issued through Ionwave. The evaluation of proposals will be based on specific weighted criteria: Cost (30 points), Qualifications (20 points), Reputation (20 points), Experience (20 points), and District Needs (10 points). All other criteria will be assigned zero value. The district reserves the right to reject any or all bids and to waive irregularities or informalities as it deems in its interest. Beverly Elementary addition and renovation scope will include the following. Complete renovation of the existing kitchen, which will include the demolition of walls, ceiling, floor, and underground plumbing in the kitchen area only, installation of new underground plumbing, new concrete kitchen floor and tile, new walls and ceiling and finishes in kitchen, all new kitchen equipment, lights, hood assemblies, mechanical systems and new building addition for the new Cooler and freezer assembly, new grease interceptor and new sanitary line. Main building work will include the removal of existing toilet partitions and installation of new partitions. Complete mechanical system controls replacement. New digital marquee. Question Deadline 10/28/2025 at 4:00 PM CT Deadline for Questions: online

Award

Educational

$282,450.00

Public - City

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
453
Active Projects
265
Bidding Soon
3,821
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2025

March 4, 2026

Project location map

715 Duchess Dr, Allen, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.