Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 11, 2025 at 7:00 PM
Updated December 12, 2025
Site work for a development in Dade City, Florida. Completed plans call for site work for a one-story above grade development.
The City of Dade City is seeking quotes for the rejuvenation and consolidation of two existing stormwater ponds located on Pond Avenue.The project involves the rejuvenation and consolidation of two existing stormwater ponds, including excavation, cleaning, regrading, landscaping, and fencing work to improve stormwater management, site safety, and aesthetics. The work shall include the following tasks: 1. Removal of Existing Berm o Remove the existing berm-style wall separating the two stormwater ponds to allow consolidation into a single, larger pond. 2. Pond Excavation and Cleaning o Excavate and clean the sides and base of the combined pond to a depth of 12–24 inches, removing accumulated sediment, debris, and vegetation as needed. o Ensure proper grading and shaping to support stormwater flow and pond functionality. 3. Construction of New Berm Wall o Construct a new berm wall around the north end of the consolidated pond. o Berm height shall raise the pond edge above the street elevation to ensure proper stormwater containment and flow management. o Use appropriate materials and compaction methods in accordance with City and applicable standards. 4. Sod Replacement and Native Planting o Install new sod on disturbed areas surrounding the pond to restore turf coverage. o Plant native vegetation, including cypress and similar species, along pond edges and berm areas to enhance aesthetics, stabilize soil, and support environmental resilience. 5. Fence Removal and Temporary Fencing o Remove any existing fencing within the project area. o Install temporary fencing as needed to secure the site and protect the public during construction activities. 6. Site Cleanup and Restoration o Remove all construction debris and restore adjacent areas disturbed during the work. o Ensure site is safe, stable, and free of hazards upon completion. 7. Compliance and Safety o All work shall comply with applicable City, county, and state stormwater regulations, environmental requirements, and safety standards. o Any and all state and county safety guidelines must be followed during excavation, construction, and landscaping activities
Bid Results
Conservation and Development
$76,603.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 4, 2025
January 20, 2026
Pond Avenue, Dade City, FL
Related To This Project
Dade City, FL
Bid Date: Jan 30 2019
Dade City, FL
Bid Date: Dec 11 2025
Dade City, FL
--
Dade City, FL
--
Dade City, FL
Bid Date: May 07 2026
Dade City, FL
--
Dade City, FL
--
Dade City, FL
Bid Date: Oct 21 2025
Dade City, FL
Bid Date: Oct 21 2025
Dade City, FL
Bid Date: Sep 30 2025
Dade City, FL
Bid Date: Sep 05 2025
Dade City, FL
Bid Date: Sep 16 2025
Dade City, FL
--
Dade City, FL
Bid Date: Jul 22 2025
Dade City, FL
Bid Date: Jul 22 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
