Site work for a water / sewer project in Buffalo, New York. Completed plans call for site work for a water / sewer project.
Various SPP Modifications . Question Deadline 11/12/2025 at 5:00 PM ET All questions should be placed in writing and directed to the Engineer, Angela Hintz at ahintz@jmdavidsoneng.com. Payment can be made by credit card or by a check made payable to Avalon Document Services. Bids may be held for a period not to exceed 60 days from the Bid Opening. No proposal or bid will be considered unless it is accompanied by a check duly certified by an incorporated bank or trust company payable to the Buffalo Sewer Authority, in the amount of not less than five per cent (5%) of the bid, or, in lieu of such check, by a bid bond prepared on the form of Proposal Bond attached hereto, payable to the Buffalo Sewer Authority, approved as to form by the Corporation Counsel of the City of Buffalo and as to sufficiency by the Comptroller of said City, and executed by the Bidder, as principal, and by a duly incorporated company authorized to guarantee the performance of contracts and to do business in the State of New York, as surety, in the penal amount of not less than twenty-five per cent (25%) of the amount of the aggregate bid. Proposal Bond need not be submitted for approval prior to the opening of the bids. The successful Bidder will be required to furnish a Payment and Performance Bond each in the full amount of the Contract with a surety company approved by the Owner, licensed to perform business in the State of New York. The bidder must comply with all provisions of the Labor Law of the State of New York in the performance of this agreement. In accordance with the provisions of Section 220 of the Labor Law, prevailing wages to be paid to laborers, workers and mechanics have been determined and fixed by the Comptroller of the City of Buffalo, New York The Buffalo Sewer Authority reserves the right to reject any or all Bids or to waive any informality in the Bidding. 25% participation goal for MBEs, a minimum 5% participation goal for WBEs, and a minimum combined 30% participation goal for M/WBE. M/WBE suppliers will be counted toward this participation goal. A. The Work consists of installation of new weir plates in four sewer patrol points (SPPs) with the Buffalo Sewer Authority's combined sewer system, repair of the weir plate in one SPP, and the installation of control panels, conduit, and sensors at three remote monitoring locations. B. The Work includes, but is not limited to, preparation of existing concrete, fabrication of weir plates, installation of weir plates, installation of new sanitary sewer controls, installation of sensors, routing conduit from sensors to control cabinets, fabrication and installation of control cabinets, and restoration of the project sites. 1. Furnishing labor, material, superintendence, power, light, heat, fuel, water, tools, appliances, equipment, supplies, services and other means of construction necessary or proper for performing and completing the Work 2. Maintaining the Work area and site in a clean and acceptable manner 3. Protection of finishing and unfinished Work 4. Furnishing proper equipment and machinery, of a sufficient capacity, to facilitate Work and to handle issues normally encountered in Work of this character. 5. Furnishing, installing and protecting necessary supports, anchor and attachment bolts, and other appurtenances needed for the installation of the Work. C. The Work is located in the City of Buffalo, in Erie County, NY, at the following locations: 1. SPP 336B - Humboldt Parkway 2. SPP 175 - Michigan Avenue at DodgeStreet 3. SPP 176 - Michigan Avenue at Riley Street 4. SPP 177 - Michigan Avenue at Glenwood Avenue 5. Smith Perry Real Time Control (RTC) site - near intersection of Smith Street and Clifford Street 6. SPP 340 - Hagen Street near Kerns Avenue 7. SPP 097 - 12 Babcock Street 8. Perry Blvd Manhole 20144 between Erie Street and Connecticut Street (50 Perry Boulevard) D. The summary of the Work described in this section is an overall summary of the responsibilities of the CONTRACTOR and his relation to the OWNER. It does not supersede the specific requirements of the other Contract Documents
Post-Bid
Water / Sewer
$1,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 24, 2025
April 1, 2026
Multiple Locations, Buffalo, NY
Related To This Project
Buffalo, NY
Bid Date: Nov 04 2025
Buffalo, NY
Bid Date: Nov 20 2025
Buffalo, NY
Bid Date: Dec 16 2025
Buffalo, NY
Bid Date: Nov 13 2025
Buffalo, NY
Bid Date: Oct 29 2025
Buffalo, NY
--
Buffalo, NY
Bid Date: Oct 30 2025
Buffalo, NY
Bid Date: Nov 25 2025
Buffalo, NY
Bid Date: Nov 03 2025
Buffalo, NY
Bid Date: Oct 21 2025
Buffalo, NY
Bid Date: Nov 06 2025
Buffalo, NY
Bid Date: Nov 07 2025
Buffalo, NY
Bid Date: Nov 06 2025
Buffalo, NY
Bid Date: Nov 14 2025
Buffalo, NY
Bid Date: Nov 19 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.