Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 21, 2025 at 7:00 PM
Updated November 22, 2025
This is a service / maintenance or supply contract in Pacifica, California. Contact the soliciting agency for additional information.
Pre bid time change from 10:00 AM to 11:00 AM as per Adda 1 Summary ***Enter the general work description or overview of the project here*** Background The purpose of this Request for Proposals (RFP) is for the City of Pacifica ("City") to solicit proposals from a wastewater engineering consultant ("Proposer" or "Consultant") to provide condition assessment updates and a 20-year project Road Map for the City's Collection System Pump Stations, Force Main and Calera Creek Water Recycling Plant (CCWRP) ("Project"). This Road Map will be used to identify, plan and budget for future projects. Please note that this RFP is for professional services, and that this is not a bid for construction services. System Background The City of Pacific owns and operates over 97 miles of sewer mains, serving 40,000 residents. Wastewater is conveyed through five sewer pump stations to the CCWRP through a 4.2-mile forcemain. The City operates two stormwater pump stations in the Linda Mar Neighborhood. The CCWRP has been in operation since 2001 and is designed to treat an average daily wastewater flow of 4 MGD and a wet weather peak hourly flow of 20 MGD, discharging effluent that meets Title 22 criteria to Calera Creek. Treatment processes include grit removal, five sequencing batch reactors for biological treatment, sand filtration and ultraviolet disinfection. Solids are treated through autothermal thermophilic aerobic digesters, gravity belt thickener and centrifuges. Project Goals Provide a 20-year project roadmap to meet or improve on our current permit requirements with respect to life cycle costs, processes performance, current and future demands as outlined in the Collection System Master Plan Update (Appendix C) and anticipated future costs and constraints. The City's FY24/25 Capital Improvements Program budget is approximately $16 million, with sewer rates increasing at 3.0% per year. The City is simultaneously conducting a sewer rate study for 2027 - 2032. Future costs and constraints include, but are not limited to: Capital and O&M Costs Energy Costs Solids Disposal Land Availability Land Use in the Coastal Zone Future discharge limitations Other factors as determined by the consultant's approach and firm's experience Highest Priority Overall Goals Wet Weather Capacity Pump Station Reliability Energy Efficiency Climate Change/Sea Level Rise A more detailed project / alternative will be developed for wet weather capacity. The Calera Creek Water Recycling Plant (CCWRP) experiences significant wet weather peak flows and adapting the Sequencing Batch Reactors (SBRs) from dry to wet weather flows is an operational challenge. The goal of Task 5 is to develop alternatives and help the City determine whether to invest further in treatment capacity vs. collection system projects to target I&I flow. For example, if a treatment process alternative were more than $20 million in total project costs, the City may choose to invest more in the collection system. Exclusions - This study will not include modelling of the Collections System; however, consultant should study and understand the existing Collection System Master Plan Update (provided in Attachment C). Recommended projects in the project roadmap should be in-line and not contradict projects identified in this document. Question Submission Deadline: November 14, 2025, 4:00pm Question Response Deadline: November 21, 2025, 4:00pm Contractor Selection Date: January 14, 2026
Conceptual
Water / Sewer
$16,000,000.00
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2026
To Be Determined, Pacifica, CA
Related To This Project
Pacifica, CA
Bid Date: Dec 18 2025
Pacifica, CA
Bid Date: Nov 25 2025
Pacifica, CA
Bid Date: Jan 09 2026
Pacifica, CA
--
Pacifica, CA
Bid Date: Feb 04 2026
Pacifica, CA
Bid Date: Oct 16 2025
Pacifica, CA
Bid Date: Aug 12 2025
Pacifica, CA
--
Pacifica, CA
Bid Date: Aug 22 2025
Pacifica, CA
Bid Date: Aug 08 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
