BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 10, 2025 at 7:00 PM

Updated December 6, 2025

Site work for a civil project in Miami Beach, Florida. Completed plans call for site work for a water / sewer project.

Reference Number 0000402152 Pump Station 24 (PS24) was initially installed as part of the Bayshore Neighborhood No. 8 drainage improvements project during 2015/2016. PS24 consists of a stormwater duplex at W 23rd Street and North Bay Road in Miami Beach, with a design capacity of 11,520 gallons per minute (GPM) per pump. The existing stormwater system includes two vortex structures, a trash rack with an emergency bypass, a dissipator box, and an outfall structure. The existing discharge pipes from the station consist of two parallel pipes of 20 inches each and a bypass pipe of 36 inches. Downstream of the dissipator box and before the outfall, the pipes are 42-inch and 36-inch. To protect Biscayne Bay, the City of Miami Beach is proposing, with this scope, the installation of one water quality pump station and two pressurized wells. This improvement is designed to sequester contaminants before discharge into the Bay, providing treatment for a portion (i.e., the first flush of runoff) of the discharge collected by PS24. The Work set forth within these Contract Documents includes the furnishing of all labor, materials, equipment, services, and incidentals necessary to complete the required Work described here, including all appurtenant work, complete, tested, and ready for operation, including temporary utilities and facilities as needed, all surveying work for layout construction and as-builts, all in conformance with these Contract Documents and City of Miami Beach Public Works Standards. This project is part of a legal agreement between the City and the Florida Department of Environmental Resources. Question Deadline 11/13/2025 at 5:00 PM MT Questions are submitted online Yes, Questions will be allowed up to 10 days before the initial deadline for submittal of Bids. Questions must be directed to nataliadelgado@miamibeachfl.gov, with a copy sent to the City Clerk rafaelgranado@miamibeachfl.gov.

Post-Bid

Water / Sewer

$1,590,897.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
110
Bidding Soon
1,698
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2025

February 3, 2026

Project location map

N Bay Rd & W 23rd St, Miami Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.