BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 6, 2025 at 7:00 PM

Updated November 27, 2025

Renovation of a water / sewer project in Council Bluffs, Iowa. Completed plans call for the renovation of a water / sewer project.

Improvements to the existing Oak Street Pump Station to increase the pump station capacity as needed for increased demands. Improvements include pump improvements, piping modifications, replacement of instrumentation, addition of an emergency generator and transfer switch; replacement of most electrical, controls, and HVAC equipment at the pump station; building tuckpointing, adding doors to the building, and other associated improvements. Owner anticipates that the estimated total project construction cost excluding any contingencies will be approximately $1.5 million. The CMAR Construction Contract has an expected start date of approximately May 2026 and duration for construction of approximately 300 days. The Project Information may be downloaded from the designated website. All prospective Proposers are urged to register with the designated website as an interested party, even if the Proposer has obtained the Proposal Documents from a source other than the designated website. Selection of the Construction Manager will be made using a two-step process. Step One: Owner will receive Statements of Qualification and Owner's designated evaluation committee will evaluate these, along with other information, to develop a list of the most highly qualified Proposers. Step Two: The most highly qualified Proposers will receive a Request for Proposals and will submit a detailed Proposal for the CMAR Contract for the Owner's consideration. The Proposal and the previously submitted Statement of Qualifications will be used together to determine the final ranking of Proposers for award of the CMAR Contract. Details regarding the selection criteria and the selection process are included in the Request for Qualifications. Question Deadline 11/19/2025 at 12:00 PM CT: Submit questions about the meaning or intent of the Proposal Documents, Addenda, and the related supplemental data to Chris Pedersen at cpedersen@snyder-associates.com.

Post-Bid

Water / Sewer

$1,500,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
95
Bidding Soon
954
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 26, 2025

May 1, 2026

Project location map

Oak St, Council Bluffs, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.