BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 31, 2025 at 7:00 PM

Updated January 1, 2026

Site work for a civil project in Kechi, Kansas. Completed plans call for site work for a one-story above grade water / sewer project; and one-story above grade road / highway.

The project will generally consist of three petition projects including: Street Paving, Water Distribution, and Sanitary Sewer. Bidding Documents, consisting of drawings and project manual, may be examined and obtained from Drexel Technologies either on CD or electronically. Bidders are encouraged to register with Drexel Technologies as a plan holder regardless of how they access the documents. All official notifications, addenda, and other Bidding Documents will be offered only through Drexel Technologies. Neither the Owner nor Engineer is responsible for documents obtained from sources other than Drexel Technologies. All purchases of Bidding Documents are non-refundable. Shipping charges are the responsibility of the requesting party. Checks are to be made payable to Drexel Technologies. Corporate, certified, or cashier’s checks are accepted. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: The Engineer is Professional Engineering Consultants, P.A. Their phone number 316-262-2691. Their address is 303 S. Topeka, Wichita, Kansas 67202Contact Name & Email: C. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered. Kevin Graham, P.E., Kevin.Graham@pec1.com The number of days to achieve Substantial Completion is 105 calendar days, from Agreement from the date stated above for the commencement of the Contract Times, resulting in a date for Substantial Completion of [date, calculated from commencement date above]; and the number of days to achieve readiness for final payment is 115 calendar days, from Agreement from the commencement date of the Contract Times, resulting in a date for readiness for final payment of [date, calculated from commencement date above].

Bid Results

Roads / Highways

$1,012,963.00

Public - City

Site Work

74

16

10

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
43
Bidding Soon
352
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2025

January 5, 2026

Project location map

East 61st St N & S Oliver St, Kechi, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.