Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 24, 2025 at 8:00 PM
Updated October 25, 2025
Site work for a playground / park / athletic field in Emporia, Kansas. Conceptual plans call for site work for a playground / park / athletic field.
Emporia State's women's soccer pitch is located on the north end of campus. The current pitch consists of a natural grass field with seating and team benches on opposite sides of the field. The plan is to install artificial turf in order to allow use of the field even after inclement weather without worry of damage to the natural turf. Additional impacts include: improved academic performance; increased access for ESU intramurals and club teams; enhance nutritional challenges of student athletes; and enhance program awareness and community service by having more youth attend instructional camps, soccer/football games/track meets while learning the importance of sports and life. Scope of the project is a phased approach: Phase one is artificial turf and lights; Phase two is a stadium (includes seating, restrooms, locker rooms, press box, suites and concessions); and Phase three is a new video board. This will also reduce the annual maintenance requirements of maintaining natural turf. The project is included in the state's 2027 - 2031 Capital Improvement Program (CIP). As of October 24, 2025, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Playgrounds / Parks / Athletic Fields
$4,080,000.00
Public - State/Provincial
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2028
1 Kellogg Cir, Emporia, KS
Related To This Project
Emporia, KS
--
Emporia, KS
Bid Date: Nov 25 2025
Emporia, KS
Bid Date: Nov 25 2025
Emporia, KS
Bid Date: Nov 21 2025
Emporia, KS
Bid Date: Dec 17 2025
Emporia, KS
Bid Date: Dec 09 2025
Emporia, KS
--
Emporia, KS
Bid Date: Jan 22 2026
Emporia, KS
Bid Date: Nov 18 2025
Emporia, KS
Bid Date: Oct 15 2025
Emporia, KS
Bid Date: Oct 22 2025
Emporia, KS
Bid Date: Oct 22 2025
Emporia, KS
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
