Published December 10, 2025 at 7:00 PM

Updated December 11, 2025

Site work and outdoor lighting for a water / sewer project in Sacramento, California. Completed plans call for site work for a water / sewer project; and for outdoor lighting for a water / sewer project.

Project Type Bid Response Types Line Items Type of Award Lump Sum. License Requirements A or C-13 Liquidated Damages $1,500 per working day Project Duration 130 working days. Bid Bond 10.00% Payment Bond 0.00% Performance Bond 0.00%. Online Q&A Yes Q&A Deadline 11/20/2025 3:00 PM (PDT). The project includes: removal of existing chain link fencing and replacement with high security hardened steel fencing around the sump station and the trash removal area. Also includes replacement of existing lights with LEDs. The project is located at City Stormwater Pump Station ("Sump") 157, 1 Morrison Avenue, Sacramento, CA. The City owns, operates, and maintains one hundred six (106) drainage sump stations within the City. The project entails the removal and replacement of the security fencing and lighting at Sump 157. The fencing will be reconfigured and replaced with high security fencing and lighting will be replaced with LED light fixtures. A. Construction of the Project consists, in general, of the following activities: 1. Performing mobilization, demobilization, and Contract administration. 2. Performing erosion and sediment control and storm water pollution prevention, and complying with all environmental controls and requirements related to the Contractor's operations as specified in the General Conditions and Special Provisions, in Project licenses and permits obtained by the Owner, and as specified elsewhere in the Specifications. 3. Performing construction surveying and construction quality control. 4. Providing all required equipment, personnel, and materials to construct the Project as required by the Plans and Specifications, and to complete the Project in accordance with the Contract schedule. 5. Providing all required temporary facilities, utilities, and offices required to complete the work. 6. Providing water for construction from available sources, including pumping, piping, hauling, and storage that may be required, and paying all fees and costs associated with developing the water supply, including pumping energy costs. Engineer's Estimate: $504,565.00 1 Mobilization/ Demobilization 2 Demolition 3 Security Fence and Gates Materials 4 Security Fence and Gates Labor 5 Reinforced Security Fence and Gates Materials 6 Reinforced Security Fence and Gates Labor 7 Structural Improvements 8 Site Grading and Paving 9 Install Lighting Upgrade

Post-Bid

Water / Sewer

$504,565.00

Public - City

Outdoor Lighting, Site Work

21

22

6

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
372
Active Projects
125
Bidding Soon
2,659
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2025

January 2, 2026

Project location map

1 Morrison Ave, Sacramento, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.