BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2025 at 7:00 PM

Updated December 3, 2025

Site work and paving for a mixed-use development in Duarte, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The General Nature of the Work Consists of furnishing all labor, material, equipment, services, and incidentals required for the traffic signal and intersection improvements for the intersection of Buena Vista Street and Kellwil Way. The scope of the work includes removal of existing traffic signal equipment, removal of conflicting signing and striping, installation of new signing and striping, installation of new traffic signal system, removal of existing ADA ramps, removal of existing sidewalk, installation of new ADA ramps, installation of new sidewalk, and installation of new bulb-outs. Type of Award Lump Sum Response Types Line Items License Requirements Class A Question Deadline 10/29/2025 at 2:00 PM PT Online Q&A Yes Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages $1,000 per calendar day Project Duration 180 Working Days Pursuant to the provisions of Section 1770-1777 of the Labor Code of the State of California, Director of the Department of Industrial Relations has ascertained the general prevailing rate of wages and employer payments for health and welfare, vacations, pension and similar purposes in the City in which the work is to be done. Information relative to the employment of apprentices shall be obtained from the Director of the Department of Industrial Relations, who is the Administrative Officer of the California Apprenticeship Council. The Contractor shall forfeit, as penalty to the Agency fifty dollars ($50.00) for laborers, workmen, or mechanics employed for each calendar day or portion thereof, if such laborer, workman or mechanic is paid less than the general prevailing rate of wages herein referred to and stipulated for any work done under the proposed contract, by him, or by any subcontractor under him, in violation of the provisions of the Labor Code and, in particular, Sections 1770 to 1781 inclusive. Copies of all collective bargaining agreements relating to the work as set forth in the afore mentioned Labor Code are on file and available for inspection in the office of the Department of Industrial Relations, Division of Labor Statistics and Research. Attention is directed to the provisions of Chapter 9, Division 3 of the Business and Professions Code requiring Contractors to be licensed. No proposal will be accepted from any Contractor unless he is licensed in accordance with the laws of this state. Contractor shall procure all permits incident to the lawful prosecution of the work. Further, the Labor Code of the State of California prohibits a Contractor from performing work on a public works project with a subcontractor who is ineligible pursuant to Section 1777.1 or 1777.7 of said code. The City's policy is to award bids to the lowest responsive and responsible bidder. Requests for proposals are awarded to the company whose proposal provides the best overall value and best meets the needs of the City. Each bid must be accompanied by cash, certified or cashier's check, or bidders bond made payable to the City of Duarte for an amount equal to at least ten percent (10%) of the amount bid, such guaranty to be forfeited should the bidder to whom the contract is awarded fail to enter into the contract.

Award

Roads / Highways

$575,165.00

Public - City

Paving, Site Work

10

9

7

6

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
526
Active Projects
223
Bidding Soon
3,684
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2025

December 10, 2025

Project location map

Buena Vista St & Kellwil Way, Duarte, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.