BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2025 at 7:00 PM

Updated December 5, 2025

Demolition and renovation of a medical facility in Las Vegas, Nevada. Completed plans call for the demolition of a medical facility; and for the renovation of a medical facility.

Question Cuttoff Date & Time 11/10/2025 07:00:00 PM (ET) Questions regarding access to NGEM can be directed to Fred Parandi via email (fred.parandi@umcsn.com) or by phone at 702-383-2346. SCOPE OF WORK SUMMARY: This project is located at 1800 W Charleston Blvd, Las Vegas, NV 89102. The work will take place within the 7 Story Tower and Trauma Building of University Medical Center of Southern Nevada. As a part of the scope of the project, the existing traction elevators will be completely replaced and/or refurbished to meet current safety standards, improve efficiency, and enhance user experience. This project is anticipated to include demolition. All questions/requests for clarification related to this Bid must be received in the NGEM system no later than 4:00 p.m. on Monday, November 10, 2025. OWNER aims to issue any necessary Addenda by close of business Friday, November 14, 2025. However, OWNER reserves the right to issue Addenda after said date. ESTIMATED COST 5,151,687.20 Scope of Work The scope of this project involves the complete modernization of the existing traction elevators, T1, T2, S4, S5, S5A, P2 and P3 at UMC. This will include replacement and/or refurbishment of components to meet current safety standards, improve efficiency, and enhance user experience. Key activities will include: Removal and demolition of existing elevators to include: careful extraction of existing elevator components designated for replacement, proper disposal of debris and old equipment in accordance with regulations, and demolition and removal of existing structures, where necessary, to accommodate new installations. Installation of new or refurbished components to include: o Replacement of old controls with modern microprocessor-based systems for enhanced speed, efficiency, and reliability o Installation of energy-efficient motors and drive systems. o Inspection, updating, and installation of fire and smoke alarms, emergency power systems, and ensuring that the system meets current safety and code requirements, including, but not limited to, ASME A17.1, ANSI A117.1 Barrier Free Code, ADA, and National Electrical Code. o Modernization of buttons, floor indicators, and key switches inside the car and in each lobby to improve user experience and meet ADA requirements. o Upgrading and replacing door operators, car door hangers, car door contacts, door protective devices, and hoist way door interlocks. o Refurbishment or replacement of interior finishes of the elevator cars, including wall panels, ceilings, and flooring. o Replacement of worn or defective parts, such as car frames, safety mechanisms, platforms, guide shoes, and emergency car lighting, as specified in the modernization plans. "UMC Modernization Specifications 09 09 25" document is to be incorporated part of the project scope. Drawing list is as follows: ARCHITECTURAL dated July 2, 2025 (Permit) GENERAL INFORMATION GO.DO INFORMATION SHEET G0.01 INDEX SHEET & CODE ANALYSIS G1.01 UL DETAILS G1.02 UL DETAILS G1.03 UL DETAILS G1.04 UL DETAILS ARCHITECTURAL A1.00 SITE PLAN AD2.08 ROOF DEMOLITION PLANS @ 7STORY TOWER AD2.16 OVERALL DEMOL TION ROOF PLAN @ TRAUMA BUILDING AD2.21 ENLARGED DEMOLITION PLANS @ 7STORY TOWER AD2.22 ENLARGED DEMOLITION PLANS @ 7STORY TOWER AD2.23 ENLARGED DEMOLITION PLANS @ TRAUMA BUILDING A2.00 OVERALL FLOOR PLAN - BASEMENT LEVEL @ 7STORY TOWER A2.01 OVERALL FLOOR PLAN - LEVEL 1 @ 7STORY TOWER A2.03 OVERALL FLOOR PLAN - LEVEL 3 @ 7STORY TOWER A2.04 OVERALL FLOOR PLAN - LEVEL 4 @ 7STORY TOWER A2.05 OVERALL FLOOR PLAN - LEVEL 5 @ 7STORY TOWER A2.06 OVERALL FLOOR PLAN - LEVEL 6 @ 7STORY TOWER A2.07 OVERALL FLOOR PLAN - LEVEL 7 @ 7STORY TOWER A2.08 ROOF PLANS @ 7STORY TOWER A2.11 OVERALL FLOOR PLAN - LEVEL 1 @ TRAUMA BUILDING A2.12 OVERALL FLOOR PLAN - LEVEL 2 @ TRAUMA BUILDING A2.13 OVERALL FLOOR PLAN - LEVEL 3 @ TRAUMA BUILDING A2.14 OVERALL FLOOR PLAN - LEVEL 4 @ TRAUMA BUILDING A2.15 OVERALL FLOOR PLAN - LEVEL 5 @ TRAUMA BUILDING A2.16 OVERALL ROOF PLAN @ TRAUMA BUILDING A2.21 ENLARGED FLOOR PLANS @ 7STORY TOWER A2.22 ENLARGED FLOOR PLANS @ 7STORY TOWER A2.23 ENLARGED FLOOR PLANS @ TRAUMA BUILDING A4.01 INTERIOR ELEVATIONS A6.01 PARTIAL BUILDING SECTIONS A9.01 DETAILS .

Bid Results

Medical

$5,072,200.00

Public - County

Demolition, Renovation

91

14

6

4

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
4
Bidding Soon
423
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2025

January 19, 2026

Project location map

1800 W Charleston Blvd, Las Vegas, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.