BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 21, 2025 at 7:00 PM

Updated November 22, 2025

Renovation of a transportation facility in Saint Paul, Minnesota. Completed plans call for the renovation of a transportation facility.

A pre-bid conference will be held in person at the conference room at the St. Paul Airport Holman Field Administration Building. The address is 644 Bayfield St, St Paul. The pre-bid can also be attended virtually via computer, tablet, or smartphone. The Design Consultant, Construction Coordinator, and MAC's Representatives will review the Contract Documents with Bidders and Subcontractors, and will respond to all contractor and subcontractor questions. This project has work at the St. Paul Holman to provide equipment replacement. Mechanical work includes new boilers, piping, heaters, exhaust fans, and ductwork. Electrical work includes support of mechanical scope.

Bid Results

Transportation Terminals

$1,108,000.00

Public - State/Provincial

Renovation

24

14

15

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
265
Active Projects
126
Bidding Soon
1,572
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2025

January 12, 2026

Project location map

644 Bayfield St, Saint Paul, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.