BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 29, 2025 at 7:00 PM

Updated December 30, 2025

Renovation of a mixed-use development in Quebec, Quebec. Completed plans call for the renovation of a stadium; and clubhouse / community center.

Reference number: 20102259 Deadline for receipt of complaints 2025-11-10 There is provision for a tendering process for each tender no Electronic tender submission accepted Yes, via SEAO, with a document Expected duration of the contract without options (in months) 3 Description The work covered by this contract is located at the Chauveau soccer complex (7200 Boulevard de l'Ormiere) and the Monseigneur-Marcoux community center (2025 Rue Adjutor-Rivard). With a view to decarbonization and improving energy efficiency, the project mainly involves the addition of heat pumps and other equipment such as electric water heaters or indirect equipment integrated into the buildings' existing systems. The work includes, but is not limited to: - Installation of new heat pumps, including visual screens on the roof (equipment provided by the City); - Integration of refrigerant heating coils into air handling units and other VRF (variable refrigerant flow) equipment (provided by the City); - Supply, installation, and connection of new heat or hot water distribution equipment (pumps, water heaters, piping, etc.) on the roof and in mechanical rooms; - Installation of new piping networks for glycol heating (hydronic or refrigerant loop); - Necessary electrical connection work; - Addition and connection of new equipment to the centralized regulation and control system; - Required structural modifications and reinforcements to buildings; - Work related to waterproofing and new roof openings; - Full commissioning of installations, in coordination with other disciplines and suppliers involved; - And any other related work required for the successful completion of the project. The work will take place during the winter in occupied buildings. Service interruptions (heating and domestic water) for the new connections should therefore have little or no impact on the occupants. Plan for this work to be carried out outside of occupancy hours if necessary.

Award

Arenas / Stadiums

$774,932.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
2
Bidding Soon
606
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2025

December 16, 2025

Project location map

Multiple Locations, Quebec, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.