BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 3, 2025 at 7:00 PM

Updated December 4, 2025

Site work and paving for a bridge / tunnel in Barnstable, Massachusetts. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

FY26 Oyster Harbors Bridge Rehabilitation. construction requirement for this project isa minimum of 10.4% combined MBE/WBE participation by state certified MBEs and WBE Contractor Prequalification by the Massachusetts Department of Transportation (Mass DOT) in accordance with the Shared Streets and Spaces Program and M.G.L. c. 90, 34, 720 CMR 5.00. Mass DOT prequalification of contractors with class of work as Bridge Construction The work will consist of furnishing all labor, materials and equipment necessary to rehabilitate the Oyster Harbors Bridge (Bridge Street over West-North Bay) in the Town of Barnstable. The project will consist of a Base Bid and additional Bid Alternates, as described below. Rehabilitation work for the Base Bid includes: Removal and replacement of existing sidewalk joint plate on the north sidewalk joint at the east end of Span 2; Concrete repairs to the underside of deck, curbs, sidewalks, counterweight, and bearing support; Installation of a steel repair to 7 deteriorated stringers in Span 1; Removal and replacement of the truss FB6 in Spans 3, including use of Temporary Shoring; Installation of a steel repair to the webs of the counterweight link arms; Installation of a steel repair to the bottom flanges of one end floorbeam and all 3 interior floorbeams in Span 2, Installation of a steel repair to the bottom flanges of 38 stringers in Spans 1 and 3; Installation of a steel repair to the web of 1 stringer in Span 2, Replacement of the machinery support platform and hangers, Rebalancing of the counterweight; Removal and disposal of the existing span drive machinery up to and not including the intermediate open gear sets; Installation of new span drive machinery; Installation of new span lock machinery; Shimming of the live load supports; Cleaning and painting of all new and existing to remain machinery systems; furnishing, installation, testing, and placing in satisfactory operating condition of the complete bridge electrical system for control and operation of the bascule span, control house, and operating machinery electrical facilities. Rehabilitation work for Bid Alternate 1 includes: Installation of a post-tensioned steel repair to the bottom flange of the 4 girders in Spans 1 and 3. Rehabilitation work for Bid Alternate 2 includes: Installation of a steel repair to the web and bottom flanges of the 8 interior floorbeams in Spans 1 and 3. To receive consideration, Bids shall be submitted no later than the above date and time for the opening. Question Deadline 11/12/2025 at 11:00 AM ET in the public Q&A section of the online Procurement Portal.

Bid Results

Bridges / Tunnels

$4,015,500.00

Public - City

Paving, Site Work

40

8

11

11

Subscribe For Documents

84 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
588
Active Projects
322
Bidding Soon
2,460
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2025

January 28, 2026

Project location map

367 Main St, Barnstable, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.