BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 18, 2025 at 7:00 PM

Updated December 19, 2025

Renovation of an educational facility in Hillside, Illinois. Completed plans call for the renovation of a educational facility.

As of December 18, 2025, this project has not yet been awarded. A timeline for the award has not yet been established. For Proviso West Ceiling and Lighting Replacement Project. The Contractor shall furnish all labor, materials, equipment, supervision, and services necessary to perform cast-in-place concrete work, including but not limited to: foundations, slabs-on-grade, sidewalks, curbs, equipment pads, and related site and structural concrete at the Proviso East High School project. If you have questions, please feel free to contact me at Cturner@pths209.orq

Bid Results

Educational

$400,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
713
Active Projects
418
Bidding Soon
3,597
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2025

December 17, 2025

Project location map

Multiple Locations, Hillside, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.