Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 13, 2025 at 7:00 PM
Updated December 14, 2025
Site work for a road / highway in Hustonville, Kentucky. Completed plans call for site work for a road / highway.
Lincoln County PCN - 0806901272502 Hsip 1271(131) : Federal Route 127 (Us 127) (Mp 4.592) From the Us 127-carl Russell Street Intersection to the Lincoln/boyle County Line. (Mp 10.686), a Distance of 6.09 Miles. Guardrail. Syp No. 08-00954.02. The Dbe Participation Goal is 0.00%. The Department Will Only Accept Bidder Registration Forms From Contractors Who Are Prequalified in the Work Categories of the Particular Project. Registration Will Be Closed at 3:00 Pm on the Day Preceding the Letting. KY DOT - Call 110 - Guardrail - Federal Route 127 (US 127) PRIMARY COMPLETION DATE 9/30/2026 Question Deadline 11/19/2025 at 3:00 PM ET Questions about projects during the advertisement should be submitted in writing to the Division of Construction Procurement. This may be done by email to kytc.projectquestions@ky.gov. The deadline for posting answers will be 3:00 pm Eastern Daylight Time, the day preceding the Letting. Guardrail. This project replaces substandard end treatments and guardrail on US 127 from MP 4.592 to 10.686. The approximate locations and estimated quantities of guardrail are noted on the Guardrail Summary. Refer to the Special Note for Guardrail, Typical Section, and Guardrail Summary Sheet for more detail and information on this item of work. NOTE: When the plans call for a Type 1 or Type 4A End Treatment, a MASH eligibility letter from FHWA is required for these end terminals. When a MASH tested eligibility letter is not available for the end terminal being utilized, the most recent NCHRP 350 eligibility letter from FHWA for that terminal will apply. Acceptance of the terminal will be at the discretion of the Engineer. Cribbing. There are locations within the project where cribbing is proposed. Locations are noted on the Cribbing Summary. Refer to the Guardrail Cribbing detail sheet for more information.
Award
Roads / Highways
$1,558,301.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 20, 2025
December 22, 2025
US-127, Hustonville, KY
Related To This Project
Hustonville, KY
Bid Date: Nov 20 2025
Hustonville, KY
Bid Date: Sep 28 2023
Hustonville, KY
--
Hustonville, KY
Bid Date: Sep 22 2023
Hustonville, KY
Bid Date: Oct 21 2022
Covington, KY
Bid Date: Nov 20 2025
Combs, KY
Bid Date: Nov 20 2025
Elizabethtown, KY
Bid Date: Nov 20 2025
Stab, KY
Bid Date: Nov 20 2025
Greensburg, KY
Bid Date: Nov 20 2025
Mayfield, KY
Bid Date: Nov 20 2025
Pikeville, KY
--
Frankfort, KY
Bid Date: Nov 20 2025
Middlesboro, KY
Bid Date: Nov 18 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
