BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 10, 2025 at 7:00 PM

Updated December 11, 2025

Renovation of a mixed-use development in Harvard, Illinois. Working plans call for the renovation of a swimming pool.

As of December 10, 2025, bids received were rejected as the city was able to repair the boiler. Replacement Of Boiler At Harvard Aquatic Center Any questions proposed during the bidding process, or requests for a facility tour, can be made via telephone or email to Trevor Dolgach at 815-206-9773 or dolgach@cityofharvard.org.

Final Planning

Swimming Pools

$100,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
9
Bidding Soon
3,203
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2025

June 10, 2026

Project location map

607 Galvin Pkwy, Harvard, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.