BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 23, 2025 at 7:00 PM

Updated December 24, 2025

Site work and paving for a civil project in McDavid, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and bridge / tunnel.

Counties: Escambia Road Name: SR 97 (Atmore Hwy) Limits: From SR 95 (US 29) TO ALABAMA STATE LINE Project(s): 45082115201(*) Federal Aid No: D325058B Project(s): 45082115202 Federal Aid No: D325058B Total Roadway Length:21.991 Miles Total Bridge Length: 0.003 Miles Total Proposal Length: 22.021 Miles Contract Days: 567 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Days Please read the full advertisement The Improvements under this Contract consist of FPID 450821-1-52-01, SR 97 (Atmore Highway) from SR 95 (US 29) to the Alabama State Line in Escambia County. Existing travel lanes, auxiliary lanes, and paved shoulders will be resurfaced. Additionally, the project incudes necessary signing and pavement marking upgrades for improved safety and function. The improvements under FPID 450821-1-52-02 consist of storm sewer improvements at the SR 95 (US 29) intersection. This construction will improve drainage and alleviate historic flooding by installing an additional 3'x8' box culvert across the southern leg of the intersection and two (2) additional 24" cross drains on the norther leg of the intersection. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. Question Deadline 11/26/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 008 - Resurfacing - SR 97

Award

Roads / Highways

$14,277,297.00

Public - State/Provincial

Paving, Site Work

263

5

6

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
65
Bidding Soon
729
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.