Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 3, 2026 at 8:00 PM
Updated April 4, 2026
Site work and paving for a civil project in Tomball, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
Road Reconstruction and Drainage Improvements of Hufsmith-Kohrville Road - Segment 3A from North of Ezekiel Road to North of Boudreaux Road for Harris County Precinct 3 Question Deadline 11/14/2025 at 12:00 PM CT SPECIFICATION The project will consist of furnishing all labor, supervision, equipment, materials, and incidentals necessary to perform road reconstruction and drainage improvements of Hufsmith-Kohrville Road - Segment 3A from North of Ezekiel Road to North of Boudreaux Road for Harris County Precinct 3. The overall objective for this project is to reconstruct the existing 2-lane asphalt roadway into a standard concrete 4-lane boulevard section, with curb and gutter and storm sewer. This project construction of storm sewer improvements, and roadside ditch improvements ultimately discharging into Harris County Flood Control District (HCFCD) Channel M122-00-00. Major work activities include off-site disposal of about 22,508 cubic yards of excavation. The scope of work includes the reconstruction of the existing 2- lane asphalt roadway into a concrete 4-lane boulevard section with 32-foot wide medians, and curb & gutter. Drainage improvements include elimination of existing roadside ditches and construction of a new storm sewer system, storm water within the project limits will be drained into the roadway and channeled into inlets along the outside curb. The scope of work also includes clearing & grubbing, reconstruction of existing driveways in concrete, adjustments to existing utilities, new signing and pavement markings along the proposed corridor, traffic and pedestrian signals at 3 intersections (Woodland Shore, Fountain Bend, and Boudreaux), construction of a new railroad crossing north of the Boudreaux intersection, and stormwater pollution prevention efforts. Areas are to be treated with Hydromulch seeding or Bermuda Sod (for SWPPP purposes, per plans) once construction activity ceases. For bidding purposes and to get a better understanding of the requirements of this bid, please refer to the attachment titled General Notices, Notes and Information, under Supporting Documents inside Bonfire.
Award
Roads / Highways
$33,020,502.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 24, 2025
December 24, 2025
Hufsmith - Kohrville Rd, Tomball, TX
Related To This Project
Tomball, TX
Bid Date: Nov 19 2025
Tomball, TX
Bid Date: Jan 02 2026
Tomball, TX
--
Tomball, TX
--
Tomball, TX
--
Tomball, TX
--
Tomball, TX
--
Tomball, TX
Bid Date: Nov 24 2025
Tomball, TX
--
Tomball, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
